Similar Projects
Airport Job Order Contractor (JOC) For General Contracting Construction Services
Results
Flagstaff, AZ 86005

Glendale Municipal Airport Awos And Wind Cone Replacement
Renovation
Results
Glendale, AZ 85307

PSHIA Terminal 4 Infrastructure Vertical and Horizontal Transportation Modernization - Phase 1
Bidding
$30,000,000 est. value
Phoenix, AZ 85003

T4S1 Common-Use Airport Lounge
Renovation - 3,500 SF
Results
Phoenix, AZ 85034

Casa Grande Airport Cafe Space Improvements Project
Post-Bid
Casa Grande, AZ 85122

Taxiway B and Connectors Reconstruction Project
Results
Less than $2,984,610 est. value
Winslow, AZ

Replace AWOS at RYN
Results
Tucson, AZ 85735

PSHIA Terminal 4 South 1 Concourse Concrete Apron Design Bid Build
Results
Phoenix, AZ 85034

Terminal 3 North 2 Concourse
New Construction
Conception
Phoenix, AZ 85034

Ellsworth Channel Relocation
Results
Mesa, AZ 85201

On-Airport Commercial Aviation Related Development
Renovation
Post-Bid
Chandler, AZ 85286

Northwest General Aviation Redevelopment at Phoenix Sky Harbor International Airport
Renovation
Bidding
Phoenix, AZ

CBP Relocation
Renovation
Results
$500,000 to $100,000 est. value
Tucson, AZ 85756

Restroom Remodel - GCN Airport Terminal
Renovation
Results
Tusayan, AZ 86023

Last Updated 10/07/2021 07:36 AM
Project Title

158 Passenger Facility

Physical Address View project details and contacts
City, State (County) Yuma, AZ 85365   (Yuma County)
Category(s) Transportation
Sub-Category(s) Airline/Passenger Terminal
Contracting Method Competitive Bids.
Project Status Pre-Solicitation
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Future Projects: 1. Replace Passenger Terminal Building Flooring System: Demolition, removal, and replacement of 11,172 square feet of existing flooring systems spanning the public throughways on the ground floor of the Yuma International Airport Passenger Terminal. Funding: PFC Funds $ 600,000 2. Rehabilitation of GA Aircraft Aprons: Rehabilitation of 48,700 square yards of existing aircraft parking area by repairing and/or replacing the deteriorated asphalt and concrete sections. Funding: PFC Funds (Grant Match) 100,575 AIP Grant (Anticipated) $2,048,850 ADOT Grant (Anticipated) $ 100,575 Total $2,250,000 3. Acquisition of Airfield Maintenance Equipment: Replacement of existing equipment used to sweep taxiways and aprons frequented by the commercial airlines as well as the flying public including a Runway Sweeper, Small Apron/Parking Area Sweeper and Utility Vehicle. Funding: PFC Funds $ 327,000 4. Identity Management Security System: The system will ensure operational regulatory compliance through the consolidation of all identity management information into a single system for managing background checks, biometric data, badging, access control, video surveillance, continuous vetting and auditing.

Details

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents