Similar Projects
Contract No. 1 - Well Construction and Well Pump
Infrastructure
Bidding
$500,000 CJ est. value
Gowrie, IA 50543

Contract No. 2 - Watermain Construction and Well House Rehabilitation
Infrastructure
Bidding
$500,000 CJ est. value
Gowrie, IA 50543

Municipal Water Well Improvements
Infrastructure
Post-Bid
$1,131,320 CJ est. value
Dayton, IA 50530

PCC Patching
Infrastructure
Post-Bid
$750,000 CJ est. value
Fort Dodge, IA 50501

Fort Dodge CSI Phase 2 - 10th Avenue North
Infrastructure
Results
$3,300,000 est. value
Fort Dodge, IA 50501

N. 1 St Street Reconstruction
Infrastructure
Results
$2,349,925 CJ est. value
Fort Dodge, IA 50501

Poplar Avenue Traveler's Center
New Construction, Infrastructure - 10,000 SF
Pending Verification
$6,000,000 CJ est. value
Fort Dodge, IA 50501

Roads - City of Fort Dodge
Infrastructure
Pending Verification
$141,450 CJ est. value
Fort Dodge, IA 50501

Elanco Water Main Connection
Infrastructure
Post-Bid
$760,000 CJ est. value
Fort Dodge, IA 50501

Webster County Conservation Nature Center
New Construction, Infrastructure - 13,000 SF
Results
$6,700,000 CJ est. value
Fort Dodge, IA 50501

Corridor Plaza - Plat 2
New Construction, Infrastructure
Pending Verification
$10,000,000 CJ est. value
Fort Dodge, IA 50501

2022 Lift Station and Force Main
Infrastructure
Results
$1,335,096 CJ est. value
Fort Dodge, IA 50501

AML Riverside
Addition, Demolition, Infrastructure
Pending Verification
$11,100,000 CJ est. value
Fort Dodge, IA 50501

Bridge Deck Overlay
Infrastructure
Results
$644,060 CJ est. value
Barnum, IA 50518

Bridge Deck Overlay
Infrastructure
Results
$1,333,808 CJ est. value
Fort Dodge, IA 50501

Last Updated 03/22/2023 11:42 AM
Project Title

Georgia Pacific Water Main Connection

Physical Address View project details and contacts
City, State (County) Fort Dodge, IA 50501   (Webster County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected April 2023
Bids Due View project details and contacts
Estimated Value $334,662 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

The Georgia Pacific Water Main Connection project is located along 220th Street from the Georgia Pacific facility to the intersection with Quail Avenue. The project includes the installation of 2,278 LF of 12-inch diameter PVC water main, 140 LF of 12-inch diameter DIP water main, 221 LF of 12-inch diameter trenchless water main, and associated appurtenances to connect the Georgia Pacific facility to the City of Fort D odge water system. Notice is hereby given that a public hearing will be held by the City of Fort Dodge, Iowa on the proposed contract documents (plans, specifications, and form of contract) and estimated cost for the improvement at its meeting at 6:00 P.M. on March 27, 2023, in said City Council Chambers at City Hall, at which meeting the Council proposes to hear comments from the public on the proposed plans, specifications, form of contract, and estimate of costs for the construction of the Georgia Pacific Water Main Connection. At said hearing, any interested person may appear and file objections thereto or to the cost of the proposed improvements.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents