Similar Projects
Last Updated | 05/26/2020 10:58 AM |
Project Title | Surface Water Treatment Plant Solids Handling Project |
Physical Address | View project details and contacts |
City, State (County) | Deer Park, TX 77536 (Harris County) |
Category(s) | Sewer and Water |
Sub-Category(s) | Water Treatment Plant |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | $4,000,000 to $4,500,000 |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The Surface Water Treatment Plant has three (3) lagoons that were designed to be temporary storage of the sludge produced from the river silt and the chemical coagulant. As the chemical coagulant has changed over time, the characteristics of the sludge have also changed, leading to a fluffier, less concentrated sludge taking up more volume. The Ardurra Group was hired to prepare the design, engineering plans and specifications for the solids handling improvements at the Surface Water Treatment Plant that would allow the sludge to be thickened and caught prior to going to the lagoons. This will allow the plant to reuse some of the water it loses through backwash water and desludging the clarifiers. The project entails the construction of several new facilities at the Surface Water Treatment Plant. Behind the existing holding basin, a sludge thickener will be constructed. The sludge produced by the clarifiers is too thin for any of the sludge removal processes without first being thickened. This basin will be like a clarifier where the sludge will be routed there and excess water allowed to decant off the top of the structure and collected for return water. A polymer addition system will also be built. When the sludge gets high enough in the thickener, the operator will turn on the pumps to remove the sludge. It will be injected in the line with a polymer and be discharged into a series of dewatering boxes. This will allow the sludge to be caught. Water removed from the sludge in this gravity fed dewatering plan will be captured in a lift station where it can be returned to the head of plant either by way of a lagoon or through the holding basin directly. This project also makes changes to the holding basin, opening the five chambers to each other, controlled by a valve. This project will allow the sludge to be captured prior to going to the lagoons. It will then be removed from the site by being hauled to the landfill. |
||||||||||||||||||||||||||||||||||||||||||||||||||||
Details |
|
||||||||||||||||||||||||||||||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |