Similar Projects
2021 Preventive and Critical Lining
Bidding
$3,600,000 to $4,000,000 est. value
Denver, CO 80202

Sand Traps - On-Call Single Trade Services
Post-Bid
Denver, CO 80202

Balboa Park Sewer Rehabilitation
Post-Bid
Denver, CO

35th Street and Lincoln Park Sanitary Improvements
Results
Less than $2,015,784 est. value
Denver, CO 80202

Force Main and Siphon Condition Assessment and Cleaning
Results
Denver, CO 80229

Construction of the East 69th Avenue Forcemain
Post-Bid
Denver, CO 80229

Sewage Ejectors Ellie Caulkins
Results
Denver, CO 80204

Non-Destructive Excavating, Potholing, Hydro-Jetting and Vacuuming
Post-Bid
Denver, CO 80204

High Point Possum Gully Sanitary Sewer
Results
Denver, CO

FNS Sanitation System
Term Contract
Post-Bid
CO

East 16th Avenue System, Phase 1
Results
$8,500,000 to $9,400,000 est. value
Denver, CO 80202

East 64th Avenue and Denali Street Infrastructure Project
Post-Bid
Denver, CO 80202

R3 S6 Sand Trap Cleaning
Results
Denver, CO 80204

Transmission System Structure Rehabilitation
Post-Bid
Denver, CO 80229

Tunnel Sewer Repairs
Results
Denver, CO

Last Updated 08/11/2020 03:51 PM
Project Title

Interceptor Rehabilitation 2020 - 2022

Physical Address View project details and contacts
City, State (County) CO   (Denver County)
Category(s) Sewer and Water
Sub-Category(s) Sanitary Sewers
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

1. Rehabilitating approximately 2,200 linear feet of existing North Primary Influent and Effluent Conduits to and from North Primary Clarifiers ranging from 42 to 114-inch diameter, 3 diversion chambers and the 6-foot by 6-foot North Primary Effluent Collection Channel. 2. Rehabilitating approximately 35,000 linear feet of existing interceptor pipe segments. Through the Interceptor Condition Assessment Program, initial pipe segment condition ratings are determined by the RR&R Department Transmission Division CCTV inspection and final condition ratings by Engineering Department review of the CCTV inspection. Pipe segments rated Very Poor are rehabilitated. Pipe segments rated Poor or Fair/Poor that are immediately adjacent to the Very Poor segments are also considered for rehabilitation. The goal is to rehabilitate longer contiguous runs of pipe segments that include Very Poor and Poor segments, and Fair/Poor segments as appropriate, resulting in lower overall costs for rehabilitation and reduced overall impact on the public. 3. Rehabilitating approximately 45 existing manholes based on the RR&R Department Transmission Division Surface Inspection and Engineering Department review and inspection.

Details

Division 03 - Concrete, Precast Concrete.
Division 33 - Utilities, Sanitary Sewerage Utilities, Sanitary Utility Sewerage Piping, Sanitary Utility Sewerage Force Mains, Sanitary Utility Sewerage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents