Similar Projects
Last Updated | 07/10/2023 06:02 PM |
Project Title | Shoreline and Bow Lake RTS Tipping Floor Resurfacing - Rebid |
Physical Address | View project details and contacts |
City, State (County) | Seattle, WA 98188 (King County) |
Category(s) | Single Trades |
Sub-Category(s) | Environmental |
Contracting Method | Competitive Bids |
Project Status | Contract Award, Construction start expected July 2023 |
Bids Due | View project details and contacts |
Estimated Value | $1,504,800 [brand] Estimate |
Plans Available from | Agency's Affiliate |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | **As of May 17,2023, no bids received.** Synopsis: The Shoreline and Bow Lake Recycling Transfer Station tipping floors need to be resurfaced with Met-Top E abrasion resistant material with a minimum of 1 1/2" to 2" thickness. The Work will be completed at two separate locations, and will require surface preparation and resurfacing. Engineers Estimate: $872,637.00 Work site: Shoreline Recycling and Transfer Station, 2030 N 165th St, Shoreline, WA 98133 and Bow Lake Recycling and Transfer Station, 18800 Orillia Rd S, Seattle, WA 98188. |
||||
Details |
|
||||
Bidder's List | View project details and contacts | ||||
Prospective Bidders | View project details and contacts | ||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |