Similar Projects
North Beach Area Primary Access - 18033A - City of Corpus Christi
New Construction, Infrastructure
Conception
$1,025,000 CJ est. value
Corpus Christi, TX 78409

North Beach Area Primary Access - 18033A - City of Corpus Christi
New Construction, Infrastructure
Conception
$1,025,000 CJ est. value
Corpus Christi, TX 78409

Kram ST New Warehouses
New Construction, Infrastructure - 16,000 SF
Design
$2,275,000 CJ est. value
Corpus Christi, TX 78413

Kram ST New Warehouses
New Construction, Infrastructure - 16,000 SF
Design
$2,275,000 CJ est. value
Corpus Christi, TX 78413

USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Bidding
$25,000,000 CJ est. value
Seattle, WA 98174

Police Headquarters Backup Generator
Infrastructure, Renovation
Bidding
$914,500 CJ est. value
Corpus Christi, TX 78401

Bldg 1869 Concrete at NAS Corpus Christi, TX
Term Contract
Post-Bid
Less than $250,000 est. value
Corpus Christi, TX

Utility Worksite Restoration Services
Term Contract
Post-Bid
Corpus Christi, TX

Paving/Concrete
Term Contract
Results
Corpus Christi, TX

Construction of Howard Boulevard
Infrastructure
Results
$45,925 est. value
Port Aransas, TX 78373

Superior Trailer
New Construction, Infrastructure - 12,250 SF
Construction
$2,014,000 CJ est. value
Corpus Christi, TX 78406

Quick Quack Car Wash - Fancy Pant
Addition, Demolition, Build-out, Infrastructure - 4,432 SF
Construction
$300,000 CJ est. value
Corpus Christi, TX 78411

Port Aransas Hotel And Conference Center
New Construction, Infrastructure
Pending Verification
$10,000,000 CJ est. value
Port Aransas, TX 78373

Seawater Desalination Plant - E15117 - City of Corpus Christi
New Construction, Infrastructure
Pending Verification
$188,570,000 CJ est. value
Corpus Christi, TX 78401

Car Rental Ready Return Parking Lot - 23101 - City of Corpus Christi
Infrastructure
Conception
$675,000 CJ est. value
Corpus Christi, TX 78406

Last Updated 12/21/2022 12:07 PM
Project Title

Beach Avenue - E. Causeway Blvd. to Dead End at Gulfbreeze Blvd. - 18007A - City of Corpus Christi

Physical Address View project details and contacts
City, State (County) Corpus Christi, TX 78402   (Nueces County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development
Contracting Method Competitive Bids
Project Status Conceptual Design, Construction start expected June 2023
Bids Due View project details and contacts
Estimated Value $734,753 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Beach Avenue is the northern most interchange road onto U.S. HWY 181. It is a two-way, two lane road bounded by E. Causeway Boulevard and the dead end beyond Gulf Breeze Boulevard. It is recommended this project include reconstruction of an existing two-lane roadway including storm water drainage, wastewater, and water utilities be updated, and curb & gutter, sidewalk, and roadway be reconstructed. The improvements to Beach Avenue will need to be coordinated with the improvements planned by the City under the North Beach Access Management Initiative Project. The proposed improvements for this project will include a three-lane roadway from E. Causeway Boulevard to Timon Boulevard and a two-lane roadway extending from Timon to the existing park at the eastern end of Beach Avenue. The project includes 5' ADA sidewalks, consistent with the C-1 Collector designation in the Urban Transportation Plan. The project includes pavement restoration, upgraded signage, pavement markings, ADA ramps, water, wastewater, and gas utility improvements, and storm water improvements as necessary. Due to the new TXDOT Harbor Bridge future increases to the traffic flow should be taken into consideration by performing a detailed traffic analysis during the preliminary design to forecast the proposed traffic increase. The project is included in the city's 2023-2025 capital improvement plan (CIP). As of December 21, 2022, further details regarding design and construction have not been identified. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents