Project Title | Beach Avenue - E. Causeway Blvd. to Dead End at Gulfbreeze Blvd. - 18007A - City of Corpus Christi |
Physical Address | View project details and contacts |
City, State (County) | Corpus Christi, TX 78402 (Nueces County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Maintenance, Paving/Reconstruction, Site Development |
Contracting Method | Competitive Bids |
Project Status | Conceptual Design, Construction start expected June 2023 |
Bids Due | View project details and contacts |
Estimated Value | $734,753 [brand] Estimate |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Beach Avenue is the northern most interchange road onto U.S. HWY 181. It is a two-way, two lane road bounded by E. Causeway Boulevard and the dead end beyond Gulf Breeze Boulevard. It is recommended this project include reconstruction of an existing two-lane roadway including storm water drainage, wastewater, and water utilities be updated, and curb & gutter, sidewalk, and roadway be reconstructed. The improvements to Beach Avenue will need to be coordinated with the improvements planned by the City under the North Beach Access Management Initiative Project. The proposed improvements for this project will include a three-lane roadway from E. Causeway Boulevard to Timon Boulevard and a two-lane roadway extending from Timon to the existing park at the eastern end of Beach Avenue. The project includes 5' ADA sidewalks, consistent with the C-1 Collector designation in the Urban Transportation Plan. The project includes pavement restoration, upgraded signage, pavement markings, ADA ramps, water, wastewater, and gas utility improvements, and storm water improvements as necessary. Due to the new TXDOT Harbor Bridge future increases to the traffic flow should be taken into consideration by performing a detailed traffic analysis during the preliminary design to forecast the proposed traffic increase. The project is included in the city's 2023-2025 capital improvement plan (CIP). As of December 21, 2022, further details regarding design and construction have not been identified. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available. |
||||
Details |
|
||||
Bidder's List | View project details and contacts | ||||
Prospective Bidders | View project details and contacts | ||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |