Similar Projects
First Avenue - River To Grant - SR11 - City Of Tucson
Infrastructure
Conception
$71,988,200 CJ est. value
Tucson, AZ 85719

Houghton Road - 22nd Street To Irvington - SR1J - City Of Tucson
Infrastructure
Conception
$40,721,000 CJ est. value
Tucson, AZ 85747

AutoZone #3618 / Tucson (Ajo)
New Construction, Infrastructure - 7,000 SF
Design
$1,500,000 CJ est. value
Tucson, AZ 85757

Valencia - Kolb To Houghton - SR14 - City Of Tucson
Infrastructure
Design
$22,388,700 CJ est. value
Tucson, AZ 85746

WHY-Tuscon HWY (SR 86) BIA 135-BIA 030 and Pinal County
Infrastructure
Bidding
$16,746,000 CJ est. value
Sells, AZ 85634

Replace Parking and Revenue Control System (PARCS)
Infrastructure
Bidding
$800,000 CJ est. value
Tucson, AZ 85756

Tangerine Road Corridor Project Interstate 10 to Dove Mountain Boulevard/Twin Peaks Road - Phase 2 - Town of Marana
Infrastructure
Post-Bid
$1,000,000 CJ est. value
Marana, AZ 85658

Ameri-Park / Marana - Revised
New Construction, Infrastructure
Post-Bid
$500,000 CJ est. value
Marana, AZ 85653

World-Wide Water Storage Tank Remediation
Term Contract
Results

Pefo Replace Water Tank Ladder
Results

Lohse Family YMCA Phase 2 - TI Package
Infrastructure, Renovation
Construction
$2,500,000 CJ est. value
Tucson, AZ 85701

River Road Townhome Development
New Construction, Infrastructure
Construction
$15,000,000 CJ est. value
Tucson, AZ 85704

22nd Street Manufacturing and Warehouse Building
New Construction, Infrastructure - 16,100 SF
Pending Verification
$2,000,000 CJ est. value
Tucson, AZ 85713

South Kolb Road Self-Storage
New Construction, Infrastructure - 14,511 SF
Pending Verification
$2,000,000 CJ est. value
Tucson, AZ 85756

La Paloma Reclaimed Reservoir Rehabilitation - W310 - City of Tucson
Infrastructure
Conception
$2,289,700 CJ est. value
Tucson, AZ 85701

Last Updated 02/07/2023 02:02 PM
Project Title

Marana Park Water Improvements Reservoir and Well

Physical Address View project details and contacts
City, State (County) Marana, AZ 85653   (Pima County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Lift and Pump Stations, Site Development, Storage/Water Tanks
Contracting Method Competitive Bids
Project Status Construction start expected April 2023 , Construction documents
Bids Due View project details and contacts
Estimated Value $500,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Marana Park Water Improvements Reservoir and Well. The consolidated projects are Town of Marana Capital Improvement Projects entailing the construction of a new 1.5 million gallon steel reservoir, piping, metering station, and chlorination station Construction Work Package #1 (CWP1) and the equipping of an existing well comprising of a new 20-inch steel casing having perforations and a grout seal (CWP2). The consolidated projects include providing and installing the necessary reservoir, pump, motor, column pipe, electrical, I&C, above ground piping, concrete wellhead and all other miscellaneous improvements.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete.
Division 04 - Masonry.
Division 05 - Metals, Structural Metal Framing, Metal Decking.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Facility Fuel Piping, Facility Fuel-Storage Tanks.
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork, Clearing and Grubbing, Grading.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains, Storm Drainage Utilities.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents