Similar Projects
Phase 1 - Tower Terrace Road W/O Barnsley to Alburnett Road Grading and Drainage
Conception
$4,400,000 est. value
Cedar Rapids, IA 52407

USACE UPRR Culverts CC
Conception
$5,000,000 est. value
Cedar Rapids, IA

Cedar Rapids Flood Risk Management, Reach 3, 12th Avenue SE Road Closure & CRANDIC Railroad Closure
Term Contract
Design
$5,000,000 to $10,000,000 est. value
Cedar Rapids, IA

Northglen Stream Improvements - City of Johnston
Alteration
Design
$400,000 est. value
Johnston, IA 50131

Fencing and Entrance Road Drainage Improvements
Infrastructure, Alteration
Bidding
$600,000 est. value
Creston, IA

Package 2 - Drainageway Derecho Cleanup
Infrastructure
Bidding
$530,000 est. value
Cedar Rapids, IA

Camp Dodge S-05 Parking Lot and S-38 Drainage Improvements
Infrastructure
Post-Bid
Johnston, IA

Drainage District No. 12 Drainage Repairs
Infrastructure
Post-Bid
Bondurant, IA

Jesup Drainage Ditch
Results
$153,885 est. value
Jesup, IA

Jesup CSD Drainage Improvements
Results
$86,500 est. value
Jesup, IA 50648

USACE McLoud Run LWR CC
Conception
$2,500,000 est. value
Cedar Rapids, IA

Crescent Chase Pond / Drainageway - City of Johnston
Alteration
Design
$1,830,000 est. value
Johnston, IA

O Avenue North West Elevation Time Check
Infrastructure
Bidding
$3,000,000 est. value
Cedar Rapids, IA 52405

Wagaman Mill Retaining Wall Repairs
Infrastructure
Post-Bid
$250,000 to $350,000 est. value
Lynnville, IA 50153

Purina Drive Flood Wall Replacement
Results
$120,300 est. value
Dubuque, IA

Last Updated 06/29/2022 02:44 AM
Project Title

2019 Flood Repairs, Willow Creek

Physical Address View project details and contacts
City, State (County) Missouri Valley, IA   (Harrison County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $400,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The improvements generally consist of the following: 33,448 CY of Channel Bank Repair; 6.5 AC of Seeding; and other items incidental thereto. Be advised there is no bridge over Willow Creek on 291 st Street; approach the channel from the west and park along the south shoulder of the road. In the event of inclimate weather, all plan holders will be advised of alternative date, time, or location of the site showing.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents