Similar Projects
Construction of the Cree Meadows Trail Project
Bidding
Ruidoso, NM 88345

Airport Road Sidewalks
Bidding
Las Cruces, NM

Construction Services
Post-Bid
Bernalillo, NM 87004

North NM 314 Bike and Pedestrian Improvements
Post-Bid
Los Lunas, NM 87031

Senior Center Service Access Parking Lot Reconstruction
Results
Las Vegas, NM

Parking Lots Improvement Project
Results
Less than $745,753 est. value
Clovis, NM

North Main Street (70/285) Country Club Road Traffic Signal Replacement
Post-Bid
Roswell, NM 88201

Z--FCCO Parking Lot Rehabilitation
Results
$250,000 to $500,000 est. value
Farmington, NM 87401

Mccain Traffic Signal Assembly Units and Replacement Components
Post-Bid
Albuquerque, NM 87102

Construction of the Tyrone Townsite ADA Improvements
Results
Silver City, NM

Copper King Trail Improvements
Post-Bid
Red River, NM 87558

On-Call Landscape Contract
Results
Less than $4,658,834 est. value
Albuquerque, NM

Sunland Park Street Paving and Sidewalk Construction On-Call
Post-Bid
Sunland Park, NM 88063

Visitors Center Pedestrian and Trailhead Improvements NMDOT Highway Safety Improvements Program
Results
Silver City, NM 88061

Sidewalk and Retaining Wall Installation
Post-Bid
Chinle, Red Valley, Window Rock, AZ - Nageezi, Pinedale, Sanostee, Tohatchi, NM 86515

Last Updated 08/10/2020 12:21 PM
Project Title

Installation of Traffic Signal at Loma Colorado Boulevard and Idalia Road

Physical Address View project details and contacts
City, State (County) Rio Rancho, NM   (Sandoval County)
Category(s) Heavy and Highway
Sub-Category(s) Sidewalks/Parking Lot, Traffic Signalization
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Bids for the construction of Temporary Traffic Signal (NMDOT Spec Span Wire) at the intersection of Loma Colorado Boulevard NE and Idalia Road NE. A pedestrian crosswalk on the north leg approach and the east leg approach will be accommodated with pedestrian signals. Street lighting will be accommodated on the three approaches that currently do not have street lighting (exists at NW corner only).

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 34 - Transportation, Transportation Signaling and Control Equipment, Roadway Signaling and Control Equipment, Traffic Signals, Traffic Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents