Similar Projects
Last Updated | 07/10/2023 03:03 AM |
Project Title | Baggage Handling System Modernization |
Physical Address | View project details and contacts |
City, State (County) | Las Vegas, NV 89101 (Clark County) |
Category(s) | Government/Public |
Sub-Category(s) | Misc. Buildings |
Contracting Method | Competitive Bids |
Project Status | Bidding, Construction start expected August 2023 |
Bids Due | View project details and contacts |
Estimated Value | $110,000 [brand] Estimate |
Plans Available from | Agency's Affiliate |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Inbound Conveyors; Upgrade of eight inbound Baggage Handling System (BHS) bag claim carousel units at T-1 and replace entirely eight inbound BHS bag claim carousel units at T-1. This scope includes but is not limited to a total of 32 in-feed conveyors on 16 units, motor controls, control systems, and supporting hardware, including interfaces to the Johnson Controls Inc (JCI) security system and supporting CCTV. Question Cuttoff Date & Time 7/4/2023 01:00:00 AM (ET) Project has been cancelled Task 1: Inbound Conveyors; Upgrade of eight inbound Baggage Handling System (BHS) bag claim carousel units at T-1 and replace entirely eight inbound BHS bag claim carousel units at T-1. This scope includes but is not limited to a total of 32 infeed conveyors on 16 units, motor controls, control systems, and supporting hardware, including interfaces to the Johnson Controls Inc (JCI) security system and supporting CCTV. Reference technical specifications and drawings for more details. Task 2: Installation of Inbound Cameras. Reference technical specifications and drawings for more details. Task 3: Power Relocation at T-1; Reconfigure standby generator power at T-1 to select ticket counters and oversize conveyors to allow "trickle" operations during utility power interruption. Includes the installation of a new control panel for standalone system operation and modification of emergency stop circuits. Reference technical specifications and drawings for more details. Task 4: UPS at T-1; Run network conduit and cabling to each uninterruptible power supply (UPS) units serving the BHS (to support future SCADA capability) at T-1 and integrate into owners existing maintenance diagnostic systems software package (MDS). Reference technical specifications and drawings for more details. Task 5: T-3 Recontrol; Upgrade all BHS Supervisory Computers and Outbound PLCs at T-3. Reprogram per Owner specifications all outbound and inbound PLCs at T-3. This scope includes the installation of a new control panel as well as new device level networking for all BHS devices. Reference technical specifications and drawings for more details. DBE goal of 14.4% Site Area Located at the northwest corner of Paradise and Bell, Laydown Area West of T1 Parking Garage A Project Site Tour will be conducted following the conclusion of the pre-bid presentation. We have arranged for transportation to and from the site. If you will be attending, please send an email noting your company's name and number of attendees to contracts@lasairport.com. |
||||||||||||||||||||||||||||||||
Details |
|
||||||||||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |