Similar Projects
Alyssum and Twinflower Storm Line Replacement - City of Forest Grove
Infrastructure
Conception
$300,000 CJ est. value
Forest Grove, OR 97116

Park Place Bridgeport Mixed Use
New Construction, Infrastructure
Conception
$6,000,000 CJ est. value
King City, OR 97224

Westbrooke Estates Mixed Use
New Construction, Infrastructure - 9,800 SF
Design
$55,000,000 CJ est. value
Hillsboro, OR 97123

OR8: SW Hocken Avenue - SW Short Street
Infrastructure
Design
$7,901,395 CJ est. value
Beaverton, OR 97005

North Transmission Line Intertie Project - CM/GC Contractor
Infrastructure
Bidding
$3,000,000 CJ est. value
Beaverton, OR 97005

RFP - Tualatin River Greenway Trail Extension
Infrastructure
Bidding
$1,400,000 CJ est. value
Tualatin, OR 97062

SW Tualatin-Sherwood Road SW Langer Farms Pkwy to SW Teton Ave and Plm_4.2 - 66" Water Transmission Pipeline
Infrastructure
Post-Bid
$69,000,000 CJ est. value
Tualatin, OR 97062

Tigard Street (Fanno Creek) Bridge Replacement - City of Tigard
Demolition, New Construction, Infrastructure
Post-Bid
$3,050,000 CJ est. value
Tigard, OR 97223

SW Division Street Culvert Replacement Project (Rebid)
Infrastructure
Results
$1,349,930 CJ est. value
Aloha, OR 97007

ASR 3 and 2 Wellhouse Improvements
Renovation, Infrastructure
Results
$4,381,728 CJ est. value
Tigard, OR 97223

Pacific Highway Street Lights - 95065 - City Of Tigard
Infrastructure
Construction
$718,423 CJ est. value
Tigard, OR 97223

New Primary School at Frog Pond Project - 2019 Capital Construction Bond - West Linn - Wilsonville School District
New Construction, Infrastructure - 58,000 SF
Construction
$32,000,000 CJ est. value
Tualatin, OR 97062

Highway 99W Pedestrian Crossing Project - City of Sherwood
New Construction, Infrastructure
Pending Verification
$11,500,000 CJ est. value
Sherwood, OR 97140

Highway 99W Pedestrian Crossing Project - City of Sherwood
New Construction, Infrastructure
Pending Verification
$11,500,000 CJ est. value
Sherwood, OR 97140

Encompass Health Inpatient Rehabilitation Hospital / Hillboro
New Construction, Infrastructure
Conception
$36,000,000 CJ est. value
Hillsboro, OR 97124

Last Updated 01/08/2024 05:16 PM
Project Title

JWC 24-Inch & 30-Inch Valve Replacement(s)

Physical Address View project details and contacts
City, State (County) Hillsboro, OR 97123   (Washington County)
Category(s) Heavy and Highway
Sub-Category(s) Bridge, Site Development
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected April 2024
Bids Due View project details and contacts
Estimated Value $300,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

JWC 24-Inch & 30-Inch Valve Replacement(s)

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Concrete Reinforcing, Precast Structural Concrete.
Division 05 - Metals, Structural Steel Framing, Structural Steel for Bridges, Steel Joist Framing, Steel Joist Girder Framing.
Division 07 - Thermal and Moisture Protection, Expansion Control.
Division 09 - Finishes, High-Performance Coatings.
Division 10 - Specialties, Signage, Traffic Signage.
Division 26 - Electrical, Exterior Lighting, Lighting Poles and Standards, Roadway Lighting.
Division 31 - Earthwork, Embankments, Erosion and Sedimentation Controls, Slope Protection, Gabions, Riprap, Special Foundations and Load-Bearing Elements, Driven Piles.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Rigid Paving, Fences and Gates, Retaining Walls.
Division 34 - Transportation, Bridges.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents