Similar Projects
Brown County Fairground Beef Barn Spray Insulation
Alteration
Post-Bid
$38,000 est. value
Aberdeen, SD 57401

Richardson Hall, Interior Phase 5
Renovation, Alteration
Results
Vermillion, SD 57069

Restroom Partitions, Hand Dryers, and Accessories
Alteration
Post-Bid
Brandon, SD

Tear Out Old Floor/Hand Rails and Replace
Alteration
Post-Bid
Mission, Rosebud, Saint Francis, SD 57570

Tiling Services - Black Hills State University
Alteration
Post-Bid
Spearfish, SD 57799

Painting, Wallcovering & Plaster Repair
Alteration
Post-Bid
SD

Music Center Stair Replacement
Alteration
Results
Rapid City, SD 57701

Roller Shades Installation
Alteration
Post-Bid
Brookings, SD 57006

Remove, Deliver and Install Lockers - Flandreau In
Results
Flandreau, SD 57028

Window Coverings - Supervisors Office - Black Hills National Forest
Results
Custer, SD 57730

Roof Repair and Water Damages inside the Road Maintenance Shop and Office Areas
Alteration
Post-Bid
Saint Francis, SD 57572

Campus Wide-Hail Storm Damage Repair
Alteration
Results
Spearfish, SD 57799

Install and Remove Holiday Decorations
Post-Bid
Ellsworth AFB, SD

Remove and Replace Carpet
Term Contract
Design
$25,000 to $100,000 est. value
Pierre, SD

Wallcovering, Paint, and Carpet Removal
Term Contract
Results
$25,000 to $100,000 est. value
Rapid City, SD 57701

Last Updated 06/27/2022 01:53 PM
Project Title

Install 14 Univents

Physical Address View project details and contacts
City, State (County) Selby, SD   (Walworth County)
Category(s) Single Trades
Sub-Category(s) Finishes/Interior
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Remove and install 14 new univents, 4 condensing units, and new Delta controls for the boiler room and pumps. Remove some old pipe that includes S traps. Include startup and programing of the equipment. Excludes any line voltage electrical work or modifications. Include new controls for the boilers and pumps. Include new cable to the elementary and middle school area from the boiler room.

Details

Division 09 - Finishes.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents