Similar Projects
3000 and 3070 S Walnut St Warehouse / Bloomington
New Construction, Infrastructure
Design
$1,500,000 est. value
Bloomington, IN 47401

Cascades Trail Phase 5 and Streambank Stabilization in Lower Cascades Park
Post-Bid
Bloomington, IN 47404

7th Street Protected Bike Lane Improvements
Post-Bid
Less than $1,500,000 est. value
Bloomington, IN 47404

ADA Ramp Installation Project
Results
Bloomington, IN 47404

Bike and Pedestrian Facilities
Results
IN

Bike and Pedestrian Facilities
Results
Bloomington, IN

IN000A Site Health Services Parking Lot
Results
Bloomington, IN

BL000A Pedestrian-Bicycle Path (Seventeenth Street)
Results
Bloomington, IN 47406

Bl000A PFAU Golf Course-New Cart Paths
Infrastructure
Results
Bloomington, IN

BL000A Site Dunn Street Pedestrian Connection
Infrastructure
Results
Bloomington, IN 47404

Karst Farm Trail Phase 2
Infrastructure
Results
Bloomington, IN

ADA Sidewalk Ramp Construction
Infrastructure
Results
IN

BL000A Hardscape, Accessibility Repairs-Neal Marshall Plaza
Infrastructure
Results
Bloomington, IN 47405

Sidewalk Repairs/Replacements and Maintenance Services
Infrastructure
Results
Bloomington, IN

Bike and Pedestrian Facilities
Infrastructure
Results
$800,000 est. value
Bloomington, IN

Last Updated 07/06/2022 07:17 AM
Project Title

BL000A Indiana University Bloomington Various Parking Lots - Repair-Repave

Physical Address View project details and contacts
City, State (County) Bloomington, IN   (Monroe County)
Category(s) Heavy and Highway
Sub-Category(s) Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $300,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Bid security for 5% of the total bid.The Owner reserves the right to accept or reject any bid and to waive any irregularities in bidding. The Owner may consider a bid to be incomplete if it does not provide the required documentation as described in this Notice, including but not limited to the Minority, Women's and Veteran's Business Enterprise Participation Plan. The Base Bid may be held for a period not to exceed sixty days before awarding Contracts. All Alternate Bids may be held for a period not to exceed ninety days before award and incorporation into the contract by proper Change Directive.Should a successful Bidder withdraw his bid, or fail to execute a satisfactory Contract within ten days after notice of acceptance of bid, the Owner may declare the Bid Security forfeited as liquidated damages, not as penalty

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents