Similar Projects
Anderson amd Church Water Mains
Bidding
Barnet, VT 05821

Morgan Springs Bulk Water Fill Station
Bidding
Bennington, VT 05201

Country Club of Bolton Homeowners Condominium Association Water System Improvement
Post-Bid
$445,200 est. value
Bolton, VT 05465

Addison County Community Trust Otter Creek Mobile Home Park Water System Improvements
Post-Bid
Less than $200,000 est. value
Vergennes, VT

Water System Remedial Expansion, Contract 8
Results
$2,000,000 to $3,000,000 est. value
Bennington, VT 05201

Randall Park Road Water Main Replacement
Results
Pittsford, VT 05763

Water System Improvements
Post-Bid
Hyde Park, VT 05655

Cortina Dry Hydrant Installation Project
Results
Mendon, VT

Ductile Iron Pipe 2021
Post-Bid
Rutland, VT

Bridge Street Infrastructure Replacement Project
Results
Richmond, VT 05477

Live Insertion Valves and Line Stops
Post-Bid
Rutland, VT

Water System South End Upgrades, Phase III, Dewey to Weeks Extension
Results
$300,000 to $350,000 est. value
Bennington, VT 05201

Milton Mobile Home Cooperative Water And Sewer Improvement Project
New Construction
Post-Bid
Less than $1,500,000 est. value
VT 05468

Middlebury Police Department Water and Site Improvements
Results
$325,000 est. value
Middlebury, VT 05753

Valve Exercising at Public Community Drinking Water Systems
Term Contract
Post-Bid
$50,000 est. value

Last Updated 12/19/2019 09:24 AM
Project Title

Water System Remedial Expansion, Contract 9

Physical Address View project details and contacts
City, State (County) Bennington, VT 05201   (Bennington County)
Category(s) Sewer and Water
Sub-Category(s) Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $2,500,000 to $3,500,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Work consists of the extension of water main line along Chapel Road in the Town of Bennington, Vermont. Specifically, the work will include trenching, removal of the existing asphalt and subbase, installation of water main, thrust blocks, hydrants, curb stops, service lines, installation of water main under Stratton Brook, installation of a water main booster pump system, sitework for placement and connection to a pre-fabricated pressure reducing valve vault (PRV), base material, and associated site work.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents