Similar Projects
Wastewater Treatment Plant - Dewatering Facility Replacement- Screw Press Procurement
Renovation, Infrastructure
Bidding
$600,000 CJ est. value
Houston, TX 77084

HCID No. 14 Dunham Pointe, Section 9 Utilities ,Sanitary Sewer, and Storm Sewer
Infrastructure
Bidding
$1,000,000 CJ est. value
Houston, TX 77020

Mechanical, Electrical and Plumbing MEP (JOC)
Alteration
Post-Bid
Houston, TX

Mechanical Electrical and Plumbing Service
Term Contract
Post-Bid
Houston, TX

District Wide Plumbing Services
Alteration
Results
Aldine, TX

N19 Welding and Construction Renovations
Renovation
Results
$1,883,434 est. value
Houston, TX 77049

2022 FRP MEP Project
Alteration
Post-Bid
$3,000,000 est. value
Spring, TX

Outsourced Plumbing and Repair Service
Term Contract
Results
Deer Park, TX

Mechanical, Electrical, and Plumbing Service
Alteration
Post-Bid
Houston, TX

2022 Multi - Campus MEP Renovations
Alteration
Results
$13,000,000 est. value
Humble, TX 77396

Plumbing Supplies and Materials
Term Contract
Post-Bid
Houston, TX

Centrifuges 69th Street Purchase and Installation
Renovation
Results
$4,388,000 CJ est. value
Houston, TX 77011

Maintenance Supplies, Equipment and Services
Term Contract
Post-Bid
Waller, TX

2022 Sanitary Sewer Rehabilitation
Infrastructure
Results
$63,850 CJ est. value
Katy, TX 77493

Plumbing Services
Term Contract
Post-Bid
TX

Last Updated 04/02/2023 03:01 AM
Project Title

Construction of Wastewater Treatment Plant Sludge Pumps Replacement

Physical Address View project details and contacts
City, State (County) Houston, TX 77067   (Harris County)
Category(s) Single Trades
Sub-Category(s) Plumbing
Contracting Method Competitive Bids
Project Status Results, Construction start expected May 2023
Bids Due View project details and contacts
Estimated Value $163,750 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Scope of work to include but not limited to: Furnish all materials, labor, tools, and equipment for demolition, disposal, and replacement of existing two (2) progressive cavity sludge pumps with piping and valves. By-pass sludge pumps as needed for pipe connections and modifications to piping. Install floor drain to the existing sludge pump slab with drain piping, curb repair to the existing lift station concrete top slab, storm water pollution prevention plan and trench safety system. All work shall be in accordance with the plans and specifications. Bids received after the closing time will be returned unopened. There will be no pre-bid meeting associated with this project. Contractor is required to submit TEC Form 1295 (Certificate of Interested Parties) with their bid.

Details

Division 22 - Plumbing, Common Work Results for Plumbing.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents