Similar Projects
Marlboro Street Corridor Improvements / Trail Connector - City of Keene
Infrastructure
Conception
$1,104,000 CJ est. value
Keene, NH 03431

Marlboro Street Corridor Improvements / Trail Connector - City of Keene
Infrastructure
Conception
$1,104,000 CJ est. value
Keene, NH 03431

Hinsdale-Brattleboro Bridge - 12210C - New Hampshire Department of Transportation (NHDOT)
Demolition, New Construction, Infrastructure
Design
$61,200,000 CJ est. value
Hinsdale, NH 03451

Hinsdale-Brattleboro Bridge - 12210C - New Hampshire Department of Transportation (NHDOT)
Demolition, New Construction, Infrastructure
Design
$61,200,000 CJ est. value
Hinsdale, NH 03451

2023 Gate Valve Replacement
Infrastructure
Bidding
$150,000 CJ est. value
Keene, NH 03431

Keene Transfer Station/Recycling Center Common Space Renovation
Renovation, Infrastructure
Bidding
$1,100,000 CJ est. value
Surry, NH 03431

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

Bryant Road and Sawtelle Road Water Main Replacement and Roadway Reconstruction Project
Infrastructure
Post-Bid
Jaffrey, NH 03452

Winchester Street Reconstruction Project
Infrastructure
Results
$7,300,000 est. value
Keene, NH 03431

Pavement Preservation In Districts Iv & V
Infrastructure
Results
$3,528,456 est. value

Keene Housing Site Improvements - Multiple Locations
Renovation
Construction
Keene, NH

U-Haul of South Keene Expansion
New Construction, Infrastructure, Renovation - 12,175 SF
Pending Verification
$5,000,000 CJ est. value
Keene, NH 03431

U-Haul of South Keene Expansion
New Construction, Infrastructure, Renovation - 12,175 SF
Pending Verification
$5,000,000 CJ est. value
Keene, NH 03431

Beacon Replacement Project - 90216 / 05J0008 - City of Keene
Infrastructure
Conception
$500,000 CJ est. value
Keene, NH 03431

Plane View / Runway Heights Senior Apartments
New Construction, Infrastructure
Design
$30,000,000 CJ est. value
Keene, NH 03431

Last Updated 03/23/2023 06:08 PM
Project Title

2023 Road Rehabilitation

Physical Address View project details and contacts
City, State (County) Keene, NH 03431   (Cheshire County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected May 2023
Bids Due View project details and contacts
Estimated Value $973,731 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

**As of March 23, 2023, the award amount is $973,730.50. This purpose of this project is asphalt resurfacing on various City Streets. Work consists of cold planing existing bituminous surfaces to a depth of approx. 1", road leveling, adjusting utility structures, paving the milled area, pavement markings, traffic control, and other incidental tasks. Completion- 30 calendar days for substantial completion; 60 calendar days for contract final completion The proposed improvements, hereinafter called the Work, is located as follows: Court Street, Westview Ave to the Ashuelot River bridge Main Street, Silent Way to the Swanzey Town Line Maple Ave, Park Ave to Summit Road North Lincoln Street, Roxbury Street to Beaver Street Old Walpole Road, Maple Ave/ W. Surry Road to Hilltop Drive Summit Road, Park Ave to Hastings Ave/Maple Ave Keene Water Treatment Facility. 1. Excavation to include milling of asphalt surfaces or other removal of asphalt paving, uncovering utility structures, and removal ofunsuitable material. 2. Reconstruction, replacement, or grade adjustment of utility surface structures, including protection ofwork and maintaining road access through all phases ofthe project. 3. Preparation and construction of asphalt pavement base, leveling, and wear courses. 4. Placement and compaction ofshoulder or other gravel courses. 5. Retro-reflective paint pavement markings, landscape grading, signage, or other incidentals to roadway rehabilitation included in the plans and details. Road Rehabilitation shall be performed between May 22nd and June 20th, 2023 unless otherwise approved by the City Engineer.

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents