Similar Projects
Eastham Town Hall Direct Digital Control Design - Removal and Replacement of the Existing Pneumatic Building Control System
Alteration
Bidding
$140,000 est. value
Eastham, MA

Residential Weatherization Contractors
Post-Bid
Wareham, MA

Replace Two Air Conditioning Condensers at 36 Harold Lane
Post-Bid
Less than $25,842 est. value
Chatham, MA 02633

Heating Renovations at East Falmouth School - General Bids
Results
Less than $450,000 est. value
Falmouth, MA 02536

Preventive Maintenance of HVAC Systems, USDA APHIS Lab, Otis ANGB, MA
Results
Buzzards Bay, MA 02542

Air Conditioner Condensing Unit Replacement - Provincetown Municipal Airport
Post-Bid
Provincetown, MA 02657

Split Ductless AC Repair and Relocation
Results
Woods Hole, MA

Spbn 202020 Design Services for HVAC Upgrades in B164 and B162
Post-Bid
Bourne, MA

HVAC Controls Mantanence Service Contract
Results
Buzzards Bay, MA

Commsta Boston Heat Pump
Post-Bid
Buzzards Bay, MA

Replacement of Bathroom Exhaust Fans, Waterhouse Apartments 689-1
Results
Less than $14,000 est. value
Pocasset, MA

Owner's Project Manager for Replacement Heating Ventilation and Air Conditioning (HVAC) System for Yarmouth Police Station
Post-Bid
Yarmouth, MA 02673

Mobile Temporary 250 Ton Air Cooled Chiller at Barnstable United Elementary
Results
Marstons Mills, MA 02648

Replace Roofing System RTI HQ 5222 - Sub Bids
Post-Bid
$1,800,000 est. value
Mashpee, MA 02649

2020 United Elementary School Chiller Replacement
Results
Less than $400,000 est. value
Marstons Mills, MA 02648

Reported 08/05/2021 12:00 AM
Project Title

Installation of New HVAC Equipment for the Sandwich Hollows Clubhouse

Physical Address View project details and contacts
City, State (County) Sandwich, MA 02537   (Barnstable County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency - 07/21/21
Owner View project details and contacts
Architect View project details and contacts
Description

Consist of the installation of new equipment on two levels of the structure.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents