Similar Projects
Port Gardner Storage Facility
New Construction, Infrastructure
Post-Bid
Everett, WA 98213

Engineering Services for Parking Lot And Trailhead Development & Stormwater Management Plan
New Construction, Infrastructure
Results
Blaine, WA 98230

Friday Harbor Labs Sewer Repair
Renovation, Alteration
Post-Bid
$160,000 to $200,000 est. value
Friday Harbor, WA 98250

Stratford Lane Step to Gravity Conversion
Infrastructure, Alteration
Results
$220,878 est. value
Olympia, WA

Stromwater Operations and Maintenance
Alteration
Bidding
Port Orchard, WA 98366

Louis Thompson Tightline
New Construction, Infrastructure
Post-Bid
$5,800,000 est. value
Sammamish, WA 98074

Environmental Consulting Services for 2021 Stormwater Code Amendments
Renovation, Alteration
Post-Bid
$75,000 est. value
Sammamish, WA 98075

Cathodic Protection Installation
Infrastructure
Results
$175,000 est. value
Tacoma, WA

Stormwater Swr421 Belle Terre Road
Infrastructure
Post-Bid
WA

Ostrich Bay Creek Stormwater Treatment
Infrastructure, Alteration
Results
$1,000,000 to $1,300,000 est. value
Bremerton, WA

E 5th Street & NPS Parking Improvements
Infrastructure
Bidding
Vancouver, WA 98687

Sewer Outfall Replacement
Infrastructure
Post-Bid
$1,500,000 to $2,000,000 est. value
Friday Harbor, WA 98250

Exposed Sewer Pipe Repairs - Site 5
Infrastructure
Results
$3,200,000 to $3,700,000 est. value
Bothell, WA 98011

Reported 10/23/2021 12:00 AM
Project Title

Stormwater Management Plan

Physical Address View project details and contacts
City, State (County) WA   (San Juan County)
Category(s) Sewer and Water
Sub-Category(s) Storm/Sewers
Contracting Method Competitive Bids.
Project Status Accepting Qualifications
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Evaluation of the existing system, Capital facilities improvements for growth, changing climate, environmental enhancements and reducing maintenance, Operations and maintenance program, Maintenance needs to assure basic operation, Inspection program for private facilities, Regulatory analysis and compliance strategy, Consistency with the Town’s Comprehensive Plan, Coordination with the Town’s Critical Area Ordinance update process, Review of existing Town ordinances and procedures affecting storm water compliance of private development within the Town, Environmental protection, Water quality assessments and monitoring, Habitat protection and restoration, Illicit discharge detection and elimination, Emergency response, Civic engagement in the Master Plan development and adoption process, Municipal Code and Engineering Design Standards, including the requirements for new development, amendments.

Details

Division 03 - Concrete, Precast Concrete.
Division 33 - Utilities, Storm Drainage Utilities, Storm Utility Drainage Piping, Storm Utility Water Drains, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents