Similar Projects
Montebello Farms
New Construction
Conception
Sterling, VA 20164

Independent Hill Mixed Use
New Construction - 40,000 SF
Conception
Manassas, VA

Fenton Mill Development
New Construction - 40,000 SF
Design
$300,000,000 est. value
Williamsburg, VA 23188

White Oak Farms
New Construction
Design
Leesburg, VA 20175

Construction Trade Services
New Construction, Renovation
Bidding
Charlottesville, VA

Prequalification for the Renovate Norfolk Owner Occupied Single Family, Multi Family Homes Rehabilitation and Rental Rehab Program
Post-Bid
Norfolk, VA 23510

Major Residential Rehabilitation
Renovation - 1,764 SF
Post-Bid
Roanoke, VA

Repair Staff Housing
Results
$25,000 to $110,000 est. value
Petersburg, VA 23804

Stabilization of Jarratt House Project
Results
Petersburg, VA 23803

Hollybrook Farms
New Construction
Construction
Mount Vernon, VA

Lilly Brooke
New Construction
Construction
Amissville, VA 20106

Jefferson Square
New Construction
Pending Verification
Manassas, VA

The Preserve At Long Branch
New Construction
Pending Verification
Prince William, VA 20112

Clevenger's Village- Phase 1
New Construction - 60,000 SF
Conception
$10,000,000 est. value
Culpeper, VA

Bamboo Grove
New Construction - 9,000 SF
Design
$500,000 est. value
Charlottesville, VA

Reported 02/08/2022 11:55 AM
Project Title

Net Zero Energy Residential Construction

Physical Address View project details and contacts
City, State (County) Arlington, VA 22204   (Arlington County)
Category(s) Residential
Sub-Category(s) Single-Family Homes
Contracting Method
Project Status Construction Commenced first quarter 2022
Bids Due View project details and contacts
Estimated Value $5,205,735
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Construction of a new residence to replace an existing home at 1212 S Irving Street, Arlington, Virginia. The new residence will be the primary home for Arlington adults with developmental disabilities. Upon completion, the new home will provide a primary and permanent residence for up to five of these individuals. The new home will be constructed to meet the changing needs of the residents across their lifespans, regardless of physical and behavioral support needs.

Details

Single-Family Homes, New Construction, Single-Family Homes, Approximately 15,529 SF New Construction.
Division 03 - Concrete, Concrete Forming and Accessories, Precast Concrete, Site-Cast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork, Architectural Wood Casework.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Wood Doors, Plastic Doors, Windows, Hardware, Glazing, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Carpeting, Painting and Coating.
Division 10 - Specialties, Toilet, Bath, and Laundry Accessories.
Division 11 - Equipment, Residential Equipment, Residential Appliances.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Residential Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting.
Division 27 - Communications, Structured Cabling.
Division 31 - Earthwork, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents