Similar Projects
Madison and 57th Street
Infrastructure
Bidding
$1,694,659 est. value
West Allis, WI

Burnham Pointe Park
Post-Bid
Less than $231,532 est. value
West Allis, WI

Area Wide Sidewalk Replacement
Infrastructure
Post-Bid
Milwaukee, West Allis, WI 53288

Parking Lot
Results
Milwaukee, WI 53205

Grant Park North Access Roads/Parking Lots Reconstruction
Results
South Milwaukee, WI 53172

Habitat for Humanity ReStore
Addition, Infrastructure - 27,078 SF
Pending Verification
Wauwatosa, WI 53222

Asphalt Pavement Resurfacing, Replace Curb and Gutter, Sidewalk and Driveway Approaches Where Necessary
Infrastructure
Post-Bid
Milwaukee, WI

ADA Ramps for High Impact Paving Northside
Results
Milwaukee, WI 53288

Repair Asphalt Parking Lot
Infrastructure
Post-Bid
Milwaukee, WI

Sidewalk High Impact Paving Work
Results
Milwaukee, WI

Repair Parking Lot
Infrastructure
Post-Bid
Milwaukee, WI 53212

Sidewalk High Impact Paving
Results
Milwaukee, WI 53288

Hubbard Park Parking Lot Reconstruction
Infrastructure
Post-Bid
Shorewood, WI 53211

2021 Sidewalk Improvement Program
Results
$75,000 est. value
Milwaukee, WI

Parking Lot Repairs, Seal Coating, and Line Re-Striping
Alteration
Post-Bid
Milwaukee, WI 53295

Last Updated 04/25/2022 08:27 AM
Project Title

Police Department Parking Lot Reconstruction

Physical Address View project details and contacts
City, State (County) Shorewood, WI 53211   (Milwaukee County)
Category(s) Heavy and Highway
Sub-Category(s) Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $100,000 to $115,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

1. Removal of approximately 1,100 square yards of pavement. 2. Installation of approximately 250 tons of asphaltic pavement. 3. Removal of approximately 120 tons of impacted material. 4. Addition of approximately 1,050 tons of aggregate base. 5. Replacement of approximately 550 linear feet of pavement markings. 6. Addition of approximately 90 square yards of native landscaping.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents