Similar Projects
BP4 and BP5 - Ball Fields and Indoor Practice Facility
Post-Bid
Ypsilanti, MI

Gun Lake Park Improvement Services
Post-Bid
Wayland, MI

Bird Elementary School Paving Expansion and P-CEP JV Track and Field Replacement Project
Results
Plymouth, MI

Island Park Community Arts Pavilion
Results
Less than $53,000 est. value
Mount Pleasant, MI

Park Promenade Development
New Construction - 165,000 SF
Construction
$10,000,000 CJ est. value
Woodhaven, MI 48183

Early Childhood Education Center
New Construction - 58,000 SF
Construction
$15,000,000 est. value
Detroit, MI

2020 Softball Facility Improvement
Post-Bid
Big Rapids, MI

Brandon Park Expansion
Results
Ortonville, MI

City Line Apartments
New Construction
Construction
Kentwood, MI 49548

2020 Sf Projects – Running Track Replacement
Post-Bid
Onekama, MI 49675

Natural Playground and ADA Upgrades to Peasley Park
Results
Less than $89,945 est. value
Huntington Woods, MI

Mckinley and Farnumwood Playground Installation Services
Post-Bid
Flint, MI 48503

Design/Construction Services for Mckinley Park Improvements Project
Results
Flint, MI

Turf Field Construction and Track Reconstruction
Post-Bid
New Boston, MI

Practice Football Field Improvements
Results
Dearborn, MI

Reported 04/03/2021 12:00 AM
Project Title

Play Ground Surface, Equipment and Structures

Physical Address View project details and contacts
City, State (County) Sturgis, MI 49091   (Saint Joseph County)
Category(s) Heavy and Highway
Sub-Category(s) Park/Playground
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

to design and install two new playground areas (one on the east side of the building and one on the west side of the building) for Wall Elementary School (Grades K-2) located at 702 East Lafayette Street, Sturgis, MI 49091. Each individual playground should not exceed $200,000 (two hundred thousand dollars) or $400,000 (four hundred thousand dollars) in total. The new Wall Playgrounds are required to look similar to the playgrounds that have been recently completed and are located at Congress Elementary (located at 421 East Congress Street, Sturgis, MI) and Wenzel Elementary (located at 403 South Park Street, Sturgis, MI). These proposals should include similar colors to the other playgrounds listed above as well as a ramped structure with a roof. There should be several different climbing elements that offer a wide range of difficulty that present challenges for all children. There should be multiple slides which include a tall slides and double slides. Both playground designs should be unique with different elements, including activity panels, sensory activities and social activities.

Details

Park/Playground, Addition.
Division 11 - Equipment, Play Field Equipment and Structures, Playground Equipment, Play Structures.
Division 31 - Earthwork, Selective Clearing, Grading.
Division 32 - Exterior Improvements, Athletic and Recreational Surfacing, Site Improvements, Fences and Gates, Planting.
Division 33 - Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents