Similar Projects
Mcgee Street Bridge - Erosion and Overlay Repairs - City of Sherman
Infrastructure
Conception
$900,000 CJ est. value
Sherman, TX 75092

Mcgee Street Bridge - Erosion and Overlay Repairs - City of Sherman
Infrastructure
Conception
$900,000 CJ est. value
Sherman, TX 75092

Heritage Ranch - Phase 2-4
New Construction, Infrastructure
Design
$100,000,000 CJ est. value
Sherman, TX 75092

Remedial Repair Attoyac Bayou Site 21
Infrastructure
Design
$250,000 CJ est. value
Nacogdoches, TX 75961

Whitewright Nature Park Pond Renovation
Infrastructure
Bidding
$321,000 CJ est. value
Whitewright, TX 75491

Mantua Point Phase 2A and 2B Grading Package
Infrastructure
Post-Bid
Van Alstyne, TX

Concrete, Ramp and Asphalt Paving Project
Infrastructure
Post-Bid
$2,000,000 CJ est. value
Denison, TX 75021

2020-2021 TxCDBG Paving Improvements
Infrastructure
Results
$200,000 est. value
Sadler, TX

VA - Preventive Maintenance
Infrastructure
Results
$1,614,500 est. value
TX

Tom Bean ISD Track and Stadium Improvements
Construction
$3,162,025 est. value
Tom Bean, TX 75090

Home Place Partners - Gallagher Warehouse
New Construction, Infrastructure - 7,500 SF
Construction
$1,200,000 CJ est. value
Sherman, TX 75090

Hampton Inn & Suites Sherman
New Construction, Infrastructure - 49,260 SF
Pending Verification
$6,000,000 CJ est. value
Sherman, TX 75092

QuikTrip #1915
New Construction, Infrastructure - 5,312 SF
Pending Verification
$725,000 CJ est. value
Sherman, TX 75090

Lamberth Road Expansion - Shady Oaks To Friendship Road - City of Sherman
Infrastructure
Conception
$4,600,000 CJ est. value
Sherman, TX 75090

Freedom Jeep Showroom Addition / Sherman
Addition, Demolition, Infrastructure - 9,887 SF
Design
$2,970,000 CJ est. value
Sherman, TX 75092

Last Updated 05/25/2023 09:17 AM
Project Title

New B. McDaniel Campus - 2023 Bond - Denison Independent School District

Physical Address View project details and contacts
City, State (County) Denison, TX 75021   (Grayson County)
Category(s) Education, Heavy and Highway
Sub-Category(s) Middle/Senior High School, Paving/Reconstruction, Site Development
Contracting Method Competitive Bids
Project Status Design Development, Construction start expected February 2024
Bids Due View project details and contacts
Estimated Value $86,600,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

New school on new site 1,200 student capacity Expand elective opportunities for 5th grade Assists with the traffic pattern The school district’s bond was approved by the voters. As of May 24, 2023, further details regarding design completion have not been identified. A tentative bid schedule for contractors has not been determined. Construction is slated to begin on February 2, 2024. However, the completion timeline has not been disclosed.

Details

Division 03 - Concrete, Concrete Forming, Concrete Reinforcing, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Steel Joist Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Metal Doors and Frames, Specialty Doors and Frames, Entrances and Storefronts, Windows, Mirrors, Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Resilient Flooring, Carpeting, Painting.
Division 10 - Specialties, Visual Display Units, Chalkboards, Markerboards, Tackboards, Signage, Compartments and Cubicles, Toilet Compartments, Shower and Dressing Compartments, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Flagpoles.
Division 11 - Equipment, Foodservice Equipment, Food Preparation Equipment, Food Cooking Equipment, Food Dispensing Equipment, Service Line Equipment, Cleaning and Disposal Equipment, Educational and Scientific Equipment, Library Equipment, Audio-Visual Equipment, Laboratory Equipment, Athletic and Recreational Equipment.
Division 12 - Furnishings, Window Treatments, Casework, Furniture, Multiple Seating.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures, Commercial Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), HVAC Insulation, Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications, Distributed Audio-Video Communications Systems, Paging Systems, Public Address Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Excavation and Fill, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Speed Bumps, Pavement Markings, Athletic and Recreational Surfacing, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents