Similar Projects
Blue Lakes Country Club Roadside Stream Pipeline
Infrastructure
Bidding
$500,000 est. value
Filer, ID 83328

Transmission Line Replacement for 5 MG Tank
Infrastructure
Bidding
$710,000 est. value
Pocatello, ID

Utility Improvements - Ruth Avenue, Hickory Street, and Jefferson Street Project
Infrastructure
Post-Bid
$250,000 est. value
Sandpoint, ID 83809

Replacement of Irrigation Control System
Infrastructure
Post-Bid
$346,100 est. value
Twin Falls, ID 83301

DIJ Construct Taxilane
Infrastructure, Alteration
Results
$1,255,580 est. value
Driggs, ID 83422

Acoustic Mitigation Isolation, Phase 1
Renovation, Alteration
Results
$2,400,000 est. value
Moscow, ID

New Meadows Water System Improvements Project
New Construction, Infrastructure
Bidding
$2,500,000 est. value
New Meadows, ID

MCOP Water Meter Purchase
Infrastructure
Post-Bid
Coeur d'Alene, ID

Construction of Approximately 1100 feet of 8-inch Potable Water Line
Infrastructure
Results
$235,000 est. value
Nampa, ID 83687

Pipe
Alteration
Post-Bid
Idaho Falls, ID

Waterworks Materials Restock
Infrastructure
Results
Nampa, ID

Utility Improvements - Ruth Avenue Hickory Street Jefferson Street
Alteration
Post-Bid
$150,000 to $300,000 est. value
Sandpoint, ID

Park Ave Water Main
Infrastructure
Results
$457,920 est. value
Idaho Falls, ID 83402

2022 Waterline Surface Repair
Infrastructure
Post-Bid
Idaho Falls, ID

Annual Waterline Replacement FY22
Infrastructure
Results
Nampa, ID

Reported 06/22/2022 12:00 AM
Project Title

Yellow Pine Waterline Replacement Project

Physical Address View project details and contacts
City, State (County) Yellow Pine, ID   (Valley County)
Category(s) Sewer and Water
Sub-Category(s) Water Lines
Contracting Method Competitive Bids.
Project Status Bidding, Construction Start Expected July 2022
Bids Due View project details and contacts
Estimated Value $290,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

The Project includes replacement of approximately 2,000 feet of steel or cast iron piping with new 6-inch AWWA C900 PVC piping and ductile iron fittings, reconnection of existing customer services and installation of new isolation valves, post hydrants, and one pressure reducing valve vault. The Project is located in Yellow Pine, Idaho approximately 2.5 hours northeast of Cascade, Idaho.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents