Similar Projects
Veterans Park and North Riverwalk Upgrades - City of Manistee
Infrastructure
Conception
$560,000 CJ est. value
Manistee, MI 49660

Veterans Park and North Riverwalk Upgrades - City of Manistee
Infrastructure
Conception
$560,000 CJ est. value
Manistee, MI 49660

Lake Winds Apartment Homes / Manistee
New Construction, Infrastructure
Design
$25,000,000 CJ est. value
Manistee, MI 49660

RFP-Driveway and Parking Lot Asphalt Repairs
Infrastructure
Bidding
$80,000 CJ est. value
Manistee, MI 49660

RFP-Driveway and Parking Lot Asphalt Repairs
Infrastructure
Bidding
$80,000 CJ est. value
Manistee, MI 49660

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

Lyman and Siegfried Roads 2022 Resurfacing
Infrastructure
Post-Bid
MI

Camp, Preuss and Heuer Hill Roads 2022 Resurfacing
Infrastructure
Results
$604,336 est. value
MI

River Road 2022 HMA Resurfacing
Infrastructure
Results
$653,845 est. value
Bear Lake, MI

Dollar General / Pleasanton Township
New Construction, Infrastructure - 10,640 SF
Construction
$3,000,000 CJ est. value
Pleasanton Township, MI 49614

Manistee County Medical Care Facility Renovation
Addition, Demolition, Renovation, Infrastructure - 32,000 SF
Pending Verification
$24,000,000 CJ est. value
Manistee, MI 49660

South Breakwater Improvemens - City of Manistee
Infrastructure
Pending Verification
$1,000,000 CJ est. value
Manistee, MI 49660

Washington And Memorial Water Main - City of Manistee
Infrastructure
Conception
$478,000 CJ est. value
Manistee, MI 49660

Pit Cleaning-Bascule Bridges, Multiple Services
Infrastructure
Post-Bid

Sign Blanks, Face Materials and Completed Signs
Infrastructure
Results
Bear Lake, MI

Last Updated 07/20/2023 10:05 AM
Project Title

1st and Maple St. Intersection

Physical Address View project details and contacts
City, State (County) Manistee, MI 49660   (Manistee County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development
Contracting Method Competitive Bids
Project Status Results, Construction start expected September 2023
Bids Due View project details and contacts
Estimated Value $191,054 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

**As of July 20 2023, the project has not yet been awarded. A timeline for award has not yet been established.** Project has been Rebid. The Project consists of the following: Traffic signal updates consisting of signals, pedestrian signals, pushbuttons, sidewalk ramps, curb and gutter, and pavement markings. To access the electronic bid form, download the project documents and click on the online bid button on the bid posting page. Prospective bidders must be on the Planholder list through QuestCDN for bids to be accepted. Bid security shall be furnished in accordance with the Instructions to Bidders. Question Deadline 06/19/2023 at 5:00 PM ET

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents