Similar Projects
ExxonMobil
Renovation
Conception
$400,000,000 est. value
La Barge, WY

U-Haul
New Construction - 38,264 SF
Conception
$10,000,000 CJ est. value
Gillette, WY 82718

Scalehouse Replacements
New Construction
Bidding
$320,000 est. value
WY

Annual Trenching and Boring Services
Term Contract
Bidding
Gillette, WY

Tunnel #2 Cave-in Restoration
Alteration
Post-Bid
Torrington, WY

Owner`s Representative for the Horizontal Infrastructure and Site Planning and Development
Infrastructure
Post-Bid
Jackson, WY 83001

District 3 Stockpiles
Infrastructure
Results

District 3 Stockpiles
Infrastructure
Results

Lowe's - Warehouse - Addition
Addition - 1,000,480 SF
Construction
Cheyenne, WY 82009

Spencer Berry - Storage Units
New Construction
Pending Verification
Rock Springs, WY

Kemmerer Airport - Snow Removal Equipment Building Expansion
Addition
Post-Bid
$90,000 to $130,000 est. value
Kemmerer, WY

Rancher Complete Street Project
Infrastructure
Results
Jackson, WY 83001

Dry Storage Building
New Construction
Post-Bid
$200,000 est. value
Worland, WY 82401

Walk Path Phase II
Infrastructure
Results
$400,000 est. value
La Grange, WY

Reported 05/26/2022 12:00 AM
Project Title

Avalon International Metal Building, Foundation, and Site Improvement Package

Physical Address View project details and contacts
City, State (County) Evanston, WY 82930   (Uinta County)
Category(s) Commercial, Heavy and Highway
Sub-Category(s) Site Development, Warehouse/Storage
Contracting Method Competitive Bids.
Project Status Bidding, Construction Start Expected April 2022
Bids Due View project details and contacts
Estimated Value
Plans Available from Architect
Owner View project details and contacts
Architect View project details and contacts
Description

The work consists of the construction of a metal building system, foundations and site improvements at 1824 Union Road, Evanston, WY 82930. Generally the work included in this project consists of but is not limited to: insulated metal building system, lighting, hollow metal door and frames, door hardware, glazing, sectional doors, snow guards, foamed in place insulation metal fabrications, signage, metal building foundation, site improvement including, site lighting, pavements, curbing, sidewalks, drainage, and site related utilities.

Details

Warehouse/Storage, Renovation.
Division 02 - Existing Conditions, Subsurface Investigation, Demolition, Selective Demolition, Selective Interior Demolition.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Lighting.
Division 31 - Earthwork, Grading, Earthwork Methods.
Division 33 - Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents