Similar Projects
T.B. Hanna Station Phase 2 - 23-PRK-008 - City of Raymore
Infrastructure
Conception
$332,000 CJ est. value
Raymore, MO 64083

T.B. Hanna Station Phase 2 - 23-PRK-008 - City of Raymore
Infrastructure
Conception
$332,000 CJ est. value
Raymore, MO 64083

The Other Place Office Development / Belton
New Construction, Infrastructure
Design
$2,500,000 CJ est. value
Belton, MO 64012

Marking and Striping
Infrastructure
Bidding
$230,000 CJ est. value
Belton, MO 64012

Marking and Striping
Infrastructure
Bidding
$230,000 CJ est. value
Belton, MO 64012

2021 Curb Replacement
Infrastructure
Post-Bid
Pleasant Hill, MO

MODOT Statewide Annual Plant (Cold) Mix Oil Material - Premix
Infrastructure
Post-Bid

Venue of the Good Ranch Waterline Extension
Infrastructure
Results
MO

Bridge Washing on I-70 and Route
Infrastructure
Results
$250,000 to $500,000 est. value

Chase Bank Facility and Take 5 Oil Change / Belton
New Construction, Infrastructure
Pending Verification
$3,000,000 CJ est. value
Belton, MO 64012

Chase Bank Facility and Take 5 Oil Change / Belton
New Construction, Infrastructure
Pending Verification
$3,000,000 CJ est. value
Belton, MO 64012

Route 1-49 Cass County Bridge Deck Replacement
Demolition, New Construction, Infrastructure
Bidding
$750,000 CJ est. value
Harrisonville, MO 64701

Job Order Contract for Asphalt Pavement Repair
Infrastructure
Post-Bid
$100,000 to $250,000 est. value

Highway D Waterline Replacement
Infrastructure
Results
Belton, MO

The Depot / Raymore
New Construction, Infrastructure
Pending Verification
$75,000,000 CJ est. value
Raymore, MO 64083

Last Updated 02/20/2023 08:06 AM
Project Title

Good Parkway Improvements - 26-PRK-001 - City of Raymore

Physical Address View project details and contacts
City, State (County) Raymore, MO 64083   (Cass County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Conceptual Design, Construction start expected July 2025
Bids Due View project details and contacts
Estimated Value $580,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The Good Parkway Improvements project includes both the reconstruction of a 1/2 mile asphalt trail and additional streambank stabilization and improvements for safety and flood damage control in both the north and south segments of the Good Parkway Linear Park. This project is in included in the City of Raymore FY 2023-2027 Capital Improvement Plan (CIP). As of February 20, 2023, further details regarding design and construction have not been identified. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents