Similar Projects
Sabal Palm Village at Flagler Trail
New Construction, Build-Out - 500,000 SF
Conception
$10,000,000 CJ est. value
Miami, FL

Sabal Palm Village at Flagler Trail
New Construction, Build-Out - 500,000 SF
Conception
$10,000,000 CJ est. value
Miami, FL

One Bayfront Plaza
New Construction - 3,300,000 SF
Design
$10,000,000 CJ est. value
Miami, FL 33139

Resorts World Miami
New Construction, Renovation
Design
Miami, FL 33132

One Kane Concourse
New Construction - 52,184 SF
Sub-Bidding
$5,000,000 to $10,000,000 CJ est. value
Bay Harbor Islands, FL

42 Pine Street Apartments
New Construction - 168,691 SF
Post-Bid
$5,000,000 to $10,000,000 CJ est. value
Miami Beach, FL 33140

42 Pine Street Apartments
New Construction - 168,691 SF
Post-Bid
$5,000,000 to $10,000,000 CJ est. value
Miami Beach, FL 33140

The Plaza Coral Gables
New Construction - 2,120,000 SF
Construction
$100,000,000 est. value
Coral Gables, FL 33134

The Plaza Coral Gables
New Construction - 2,120,000 SF
Construction
$100,000,000 est. value
Coral Gables, FL 33134

Wynwood Apartments
New Construction
Conception
$10,000,000 CJ est. value
Miami, FL

Brownsville Transit Village - Phase V
New Construction - 99,854 SF
Design
$26,711,893 est. value
Miami, FL 33142

The Watermark at Merrick Park
New Construction - 256,917 SF
Construction
$21,500,000 est. value
Coral Gables, FL 33146

One Island Park
New Construction - 5,000 SF
Design
$10,000,000 CJ est. value
Miami Beach, FL

Miami Riverside Center
New Construction - 6,000,000 SF
Construction
$80,000,000 est. value
Miami, FL

One Brickell City Centre
New Construction - 743,768 SF
Design
$1,000,000,000 est. value
Miami, FL

Last Updated 05/09/2022 09:23 AM
Project Title

Modera Riverside

Physical Address View project details and contacts
City, State (County) Florida City, FL   (Miami-Dade County)
Category(s) Commercial, Residential
Sub-Category(s) Apartments/Condominiums, Office, Retail
Contracting Method
Project Status Construction Commenced April 2022, Construction Completion Expected third quarter 2024
Bids Due View project details and contacts
Estimated Value $121,454,026
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Details

Retail, Office, Approximately 555,386 SF Build-Out, Apartments/Condominiums, 36 Stories Above Grade, New Construction, 428 Unit(s), 1307 Parking Spaces.
Division 03 - Concrete, Concrete Forming and Accessories, Concrete Forming, Cast-in-Place Concrete, Precast Concrete, Site-Cast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork, Architectural Woodwork, Architectural Wood Casework.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Wood Doors, Plastic Doors, Entrances and Storefronts, Windows, Hardware, Glazing, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Acoustical Ceilings, Flooring, Carpeting, Painting and Coating, Painting.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet Compartments, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers.
Division 11 - Equipment, Residential Equipment, Residential Appliances.
Division 12 - Furnishings, Window Treatments, Casework, Rugs and Mats, Office Furniture.
Division 13 - Special Construction, Swimming Pools, Below-Grade Swimming Pools.
Division 14 - Conveying Equipment, Elevators.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Plumbing Equipment, Plumbing Fixtures, Residential Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Electronic Detection and Alarm.
Division 31 - Earthwork, Clearing and Grubbing, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Base Courses, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents