Similar Projects
Atrium and Hooton Pump Station Upgrades
Renovation
Results
$1,200,000 est. value
Willingboro, NJ

2022 Maintenance Contract Sewer Treatment Plant
Infrastructure
Results
Palmyra, NJ

Maintenance Pump Station Repair Contract Statewide - 2022
New Construction
Results
Less than $5,000,000 est. value

Upgrades and Improvements to Kellys Unmanned Sewer Pump Station (220) Marne Highway and Hainesport/Mount Laurel Road in Hainesport Township
Renovation
Results
Hainesport, Mount Holly, NJ 08036

2021 Various Pump Station Improvements
Infrastructure
Results
Maple Shade, NJ

Well 6 Pressure Filter Media Replacement
Renovation, Infrastructure
Post-Bid
$196,000 CJ est. value
Willingboro, NJ 08046

Plants Improvement Project at the Township of Medford Sewage Plants
Renovation
Post-Bid
$500,000 est. value
Medford, NJ

Renovations, Repairs, and Improvements to Plants 2 and 3, Rancocas Road Water Pollution Control Facility
Renovation
Post-Bid
$200,000 CJ est. value
Mount Holly, NJ 08060

Well No. 6 Redrill
Infrastructure
Post-Bid
$720,500 CJ est. value
Evesham, NJ 08053

Supervisory Control and Data Acquisition (SCADA) Upgrades at the Kings Grant Waste Water Treatment Plant (WWTP)
Renovation
Post-Bid
$100,000 CJ est. value
Evesham, NJ 08053

Energy Savings Improvement Program (ESIP) Energy Conservation Measure (ECM) 5 and 6 - Lighting Retrofit and Occupancy Sensors
Renovation
Post-Bid
$1,100,000 CJ est. value
Beverly, NJ 08010

Energy Savings Improvement Program (ESIP) Energy Conservation Measure (ECM) 5 and 6 - Lighting Retrofit and Occupancy Sensors
Renovation
Post-Bid
$1,100,000 CJ est. value
Beverly, NJ 08010

Wastewater and Stormwater Transportation - Burlington County Resource Recovery Complex
Infrastructure
Post-Bid
$210,000 CJ est. value
Mount Holly, NJ 08060

Sludge Pump Replacement Project
Renovation
Bidding
$400,000 CJ est. value
Medford, NJ 08055

Collection System Pump Station Improvements
Infrastructure
Bidding
$20,000 CJ est. value
Medford Lakes, NJ 08055

Last Updated 05/09/2023 01:09 PM
Project Title

Energy Savings Improvement Project (ESIP) Lighting & Envelope Improvements

Physical Address View project details and contacts
City, State (County) Beverly, NJ 08010   (Burlington County)
Category(s) Sewer and Water
Sub-Category(s) Lift and Pump Stations, Sewage Treatment Plant
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected November 2023
Bids Due View project details and contacts
Estimated Value $370,000 [brand] Estimate
Plans Available from Electrical Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Bid Proposals will be received by Schneider Electric who has been selected as the Energy Services Company (ESCO) for: Project: Energy Savings Improvement Program (ESIP): For the Customer: Willingboro Municipal Utilities Authority (WMUA), in accordance with the Drawings, Specifications, and Bid Documents as prepared by Schneider Electric. No bid may be withdrawn for a period of ninety (90) days from the day of the bid opening. Any bids received after the closing time will be returned unopened. In order to be considered, bids must be received in a sealed envelope and the outer envelope must be clearly marked specifying the Project and the appropriate Prime Bid. Schneider Electric reserves the right to reject any or all bids and waive any informality in the bidding process in accordance with the law if it is in the best interest of Schneider Electric and/or the district. The Contract, if awarded shall be awarded to the lowest responsible bidder whose bid is responsive in all material respects to the bid requirements and is in the best interest of the customer and of Schneider Electric. No bid shall be deemed accepted until the adoption of a formal subcontract by Schneider Electric. Bid responses shall be marked in a sealed envelope with the name of the project plainly marked on the front of the envelope and accompanied by a bid guarantee in the form of a certified check or Bid Bond in the amount of 10% of the bid, but not to exceed $20,000 pursuant to N.J.S.A 18A:18A-24. All applicable surety bonds required in connection with the advertisement and award of building contracts or sub agreements must be written by a surety company listed on the Federal Treasury List (Department Circular 570--Surety Companies Acceptable on Federal Bonds), incorporated herein by reference in accordance with N.J.A.C. 7:22-3.17(g). This subcontract is expected to be funded in part with funds from the New Jersey Department of Environmental Protection and the New Jersey Environmental Infrastructure Trust. Neither the State of New Jersey, the New Jersey Environmental Infrastructure Trust nor any of their departments, agencies or employees is, or will be, a party to this contract or subcontract or any lower tier contract or subcontract. This contract or subcontract is subject to the provisions of N.J.A.C. 7:22-3, 4, 5, 9 and 10. In accordance with the provisions of N.J.S.A. 58:11B-26, N.J.A.C. 7:22-3.17(a)24 and 4.17(a)24, which require that no less than 10 percent of the total amount of all contracts shall be awarded to SEDs. The contractor (subcontractor) shall comply with all of the provisions of N.J.A.C. 7:22-9.1 et seq. for the participation of small business enterprises owned and controlled by socially and economically disadvantaged individuals (SEDs). Bidders and subcontractors named in the Form of Bid Proposal for General Constructions, Plumbing, HVAC, Electrical or other applicable trades who perform any work on the Project must be pre-qualified prior to the submission of bids, pursuant to the State of New Jersey Division of Property Management and Construction DPMC. Pursuant to N.J.S.A 18A:18A-26, in order to be eligible to submit a Bid for the Project, the Bidder shall be classified by the New Jersey Department of Treasury, Division of Property management and Construction for their respective disciplines. Locations: Water Pollution Control Plant 72 Ironside Ct, Beverly, NJ 08010 Water Treatment Plant: 55 Meribrook Circle, Willingboro, NJ 08046 Main WTP building At the Well 1 30 Sylvan Lane, Willingboro, NJ 08046 At the Well 5a Windsor Park Pump Station 207 Club House Drive, Willingboro, NJ 08046 All post-site visit questions and requests for information (RFI) should be submitted to Schneider Electric personnel, via email at schneider.bidsWMUA@gmail.com, no later than, Tuesday, April 11, 2023, h by 9:00 AM. PROJECT SUMMARY Willingboro Municipal Utilities Authority (WMUA) has engaged Schneider Electric to develop an energy conservation project to reduce the energy spend and carbon footprint of several of their sites and buildings. Schneider Electric has entered into a partnership with the WMUA to achieve energy savings that will result from this project for many years. As such, Schneider Electric is seeking a partnership with qualified and reputable contractors to perform portions of this work, as described, and specified herein. Schneider Electric is soliciting bids for turnkey installations of this work and will only accept sealed bid proposals that cover all necessary labor, equipment, materials, and services required to complete the work as outlined herein and in accompanying documents. The successful contractor shall also be responsible for obtaining qualified lower-tier subcontractors to perform any additional construction that may be required as part of Subcontractor's scope of work associated with this project. Subcontractor is required to qualify through execution of Schneider Electric's Master Subcontract Agreement prior to bid acceptance. By bidding, subcontractor agrees their bid includes the necessary time and cost to properly coordinate and schedule the implementation of the scope with Schneider Electric, the Owner, the project superintendent, and other trades so that all work associated with this project can be accomplished in a timely manner with as little disruption to the occupants as possible. Project Completion is to be no longer than shown in the project schedule, Section L of the Solicitation for Proposal. Project Completion is defined as Schneider Electric acknowledging Subcontractor is 100% substantially complete with all scope, deliverables and systems operating as intended. Question Deadline 04/11/2023 at 9:00 AM ET

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows, Hardware.
Division 09 - Finishes, Painting and Coating.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet, Bath, and Laundry Accessories, Emergency Aid Specialties, Fire Protection Specialties, Fire Extinguishers, Storage Specialties, Storage Assemblies.
Division 11 - Equipment, Laboratory Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Systems, Distributed Audio-Video Communications Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Intrusion Detection, Electronic Surveillance, Electronic Detection and Alarm.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Division 40 - Process Integration, Water Process Piping.
Division 44 - Pollution and Waste Control Equipment, Common Work Results for Pollution and Waste Control Equipment, Air Pollution Control, Noise Pollution Control, Odor Control, Water Pollution Control Equipment, Solid Waste Control and Reuse, Waste Thermal Processing Equipment, Fluidized Bed Combustion Equipment, Rotary Kiln Incinerators, Pyrolysis Equipment, Hazardous Waste and Medical Waste Incinerators, Heat Recovery Equipment for Waste Thermal Processing, Synthesis Gas Cleanup and Handling Equipment.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents