Similar Projects
Shoulder Widening, Mill, AC Resurfacing, Replace Str Bridge, Approach Grading, Pipework; Signal, Crossing Surface
Infrastructure
Conception
$11,673,000 CJ est. value
Elkton, SD 57026

Shoulder Widening, Mill, AC Resurfacing, Replace Str Bridge, Approach Grading, Pipework; Signal, Crossing Surface
Infrastructure
Conception
$11,673,000 CJ est. value
Elkton, SD 57026

Tall Grass Parkway Multi-Residential Development
New Construction, Infrastructure
Design
$35,000,000 CJ est. value
Brookings, SD 57006

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Bidding
$25,000,000 CJ est. value
Seattle, WA 98174

STI University Boulvard and 22nd Avenue Gravity Sewer Improvements
Demolition, Infrastructure
Bidding
$5,000,000 CJ est. value
Brookings, SD 57006

Road Materials
Term Contract
Post-Bid
SD

Road Maintenance
Term Contract
Post-Bid
SD

Airfield Paving Construction MATOC
Results
Less than $400,000,000 est. value

Elkton Utility Improvements - Phase II
Infrastructure
Results
$3,516,957 est. value
Elkton, SD

2022 Bond - Brookings School District
New Construction, Build-out, Infrastructure
Pending Verification
$23,000,000 CJ est. value
Brookings, SD 57006

34th Avenue Mixed-Use Development
New Construction, Infrastructure
Pending Verification
$1,000,000 CJ est. value
Brookings, SD 57006

69 kV Transmission Line Tie Construction
Infrastructure
Bidding
Volga, SD 57071

Airport Pavement Maintenance Project
Infrastructure
Post-Bid

Construct Interchange Grading 446k CuYd
Infrastructure
Results
SD

Morningside Addition
New Construction, Infrastructure
Pending Verification
$1,000,000 CJ est. value
Brookings, SD 57006

Last Updated 02/16/2023 12:37 AM
Project Title

AC Resurfacing - I 29

Physical Address View project details and contacts
City, State (County) Brookings, SD 57006   (Brookings County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development
Contracting Method Competitive Bids
Project Status Conceptual Design, Construction start expected June 2025
Bids Due View project details and contacts
Estimated Value $8,918,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

I29 S - Fm SD30 to SD28 Length 11.8 As of February 16, 2023, the project is in Conceptual status. Anticipated Construction year is 2025. SDDOT - AC Resurfacing - I 29 *Project information has been obtained through a public state transportation improvement plan (STIP). A STIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the STIP often evolves based on funding availability. The project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents