Similar Projects
21G - Manhole Rehabilitation Project
Infrastructure
Bidding
$85,000 est. value
Salt Lake City, UT

Upper Conduit Repair - Construction Phase 1 - Construction
Infrastructure
Bidding
$1,341,400 est. value
Salt Lake City, UT

Seegmiller Marsh/1450 South Sewer Line Replacement R14 Reach 1 Jensen Portion
Post-Bid
Saint George, UT 84790

Waste Water Sewer Cleaning and Maintenance
Term Contract
Post-Bid
Salt Lake City, UT 84114

2018 West Jordan Manhole Raising Project
Results
$161,900 est. value
West Jordan, UT

MP15 - 700 South Interceptor Capacity Upgrade and 700 South Water Main
Results
Less than $3,293,600 est. value
Salt Lake City, UT 84115

1800 North Sewer Realignment, Phase 1 - Inverted Siphon
Infrastructure
Bidding
$7,405,389 est. value
Salt Lake City, UT

Pole Canyon Water Line and Force Main Sewer
Post-Bid
Eagle Mountain, UT

Vault Pumping - Paria
Results
Saint George, UT

Drain Cleaning Services
Term Contract
Post-Bid
Draper, Ogden, Orem, Salt Lake City, West Valley City, UT 84020

7200 South Sanitary Sewer Project
Results
Less than $2,820,200 est. value
Midvale, UT 84047

Redevelop Canaan Springs and Pipe Replacement
Post-Bid
Hurricane, UT 84737

2020 Sewer Pipe Rehabilitation By Cured-in-Place Process (CIPP)
Results
Stansbury Park, UT 84074

99--Market Survey-Sewer Line Replacement at Oakland ARTCC, ZOA
Post-Bid
Salt Lake City, UT 84103

Mt. Vista Parkway Sewer Reroute 2020
Results
Provo, UT 84606

Reported 10/13/2021 12:00 AM
Project Title

Reach 11 Sewer Line Replacement Project

Physical Address View project details and contacts
City, State (County) Hurricane, UT   (Washington County)
Category(s) Sewer and Water
Sub-Category(s) Sanitary Sewers
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Engineer - 09/20/21
Owner View project details and contacts
Architect View project details and contacts
Description

Removal of existing 24-inch RCP sewer pipeline; installation of approximately 4,725 linear feet of new 36-inch CCFRPM sewer pipeline; excavation, including hard rock, backfill, and compaction; dewatering and bypass pumping; manholes and appurtenances associated with a sewer pipeline; and all other work needed to complete the project.

Details

Division 03 - Concrete, Precast Concrete.
Division 33 - Utilities, Sanitary Sewerage Utilities, Sanitary Utility Sewerage Piping, Sanitary Utility Sewerage Force Mains, Sanitary Utility Sewerage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents