Similar Projects
Wastewater Improvements of I-75 & SR-47 Interchange Phase 1
Bidding
Lake City, FL

Trenchless Pipe Rehabilitation Services
Bidding
Palm Coast, FL

Stormwater Drainage Expertise Lakewood Ranch Inter-District Authority Community Development District 5
Post-Bid
Lakewood Ranch, FL 34202

Mirada Active Adult Phase 1 (Mirada Boulevard Phase 3B)
Post-Bid
San Antonio, FL 33576

Stormwater Management System Prevent Maintenance
Term Contract
Results
Sunny Isles, FL 33160

Pre-Cast Storm Water Control Stuctures
Results
Kissimmee, FL 34741

Stormwater Improvements
Construction
Lake City, FL 32055

Annual Construction of General Stormwater Infrastructure
Term Contract
Bidding
Fort Lauderdale, FL

Teak Follow Boulevard North, Phases 1 and 2
Post-Bid
San Antonio, FL 33576

Meigs Drive Stormwater Improvements
Results
Less than $705,895 est. value
Crestview, FL

River Oaks Stormwater Improvements
Bidding
$2,850,000 est. value
Fort Lauderdale, FL 33332

South Campus Stormwater Management - DRA #4 Project
Post-Bid
Pembroke Pines, FL 33024

Reitz Union Lawn Inner Road Thermal Infrastructure Improvements - CM-At-Risk
Results
Less than $15,000,000 est. value
Gainesville, FL

Pipe Video, Desilting, and Lining
Bidding
$200,000 est. value
FL

Abandonment of Existing Septic System
Post-Bid
Orlando, FL 32805

Last Updated 04/15/2021 11:08 AM
Project Title

S.W. Pembroke Circle Right of Way Inlet and Pipe Crossing Replacement Project

Physical Address View project details and contacts
City, State (County) FL   (DeSoto County)
Category(s) Sewer and Water
Sub-Category(s) Storm/Sewers
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $182,440
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Replacement of inlet structures and cross drains at six (6) locations on SW. Pembroke Circle. Each location includes removal of the existing inlets and cross drains between the structures, the installation of two concrete inlet structures and the connecting ADS HP storm pipe (or approved equal), sod restoration, culvert cleaning where specified, milling and asphalt installation, maintenance of traffic, and best management practices as shown on the Construction Plan Set. Please note that the connection of existing drainage pipes on the private property side of the structures will be performed by others. The plans have specific instructions to this regard. The Contractor will coordinate this work with the private developer.

Details

Division 03 - Concrete, Precast Concrete.
Division 33 - Utilities, Sanitary Sewerage Utilities, Sanitary Utility Sewerage Piping, Sanitary Utility Sewerage Force Mains, Sanitary Utility Sewerage Structures, Storm Drainage Utilities, Storm Utility Drainage Piping, Storm Utility Water Drains, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents