Similar Projects
Denmark Library
New Construction
Conception
Cumming, GA 30004

Library Renovation
Renovation
Post-Bid
Clayton, GA 30525

Replacement and Upgrade of Elevator at Mary Vinson Memorial Library
Renovation
Post-Bid
Milledgeville, GA 31061

Alterations to and Expansion of the Statham Public Library
Renovation
Results
Statham, GA 30666

Construction Services for Friedman Branch Library Renovations
Renovation
Results
Augusta, GA 30909

Construction of the Gwinnett County Duluth Branch Library
New Construction - 22,000 SF
Construction
$5,000,000 est. value
Lawrenceville, GA 30046

Addition to Auburn Public Library
Addition
Construction
Auburn, GA 30011

Addition/Renovation Of The Vidalia Toombs County Library
Renovation, Alteration - 17,812 SF
Post-Bid
Vidalia, GA 30474

Conyers Rockdale Library
Renovation - 47,248 SF
Results
Less than $694,628 est. value
Conyers, GA

Construction of New Public Library
New Construction - 4,700 SF
Construction
Less than $950,000 est. value
Georgetown, GA 39854

Expansion of the Braselton Library
Addition - 8,166 SF
Post-Bid
Braselton, GA 30517

Renovations and Additions of Cusseta Library
Renovation, Addition - 6,338 SF
Results
$1,227,000 est. value
Cusseta, GA 31805

Construction of New Snellville Library and Mixed-Use Building
New Construction - 91,926 SF
Construction
Snellville, GA 30078

Construction for the Expansion of the Library
Addition
Post-Bid
Braselton, GA

Library Pavilion Construction
New Construction
Results
Dahlonega, GA 30533

Last Updated 03/10/2022 10:31 AM
Project Title

East Side Public Library Project - SPLOST 2020

Physical Address View project details and contacts
City, State (County) Athens, GA   (Clarke County)
Category(s) Government/Public
Sub-Category(s) Library - Public
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value Less than $6,100,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Scope: The work shall include, but not be limited to the following: The qualified and successful respondent will be responsible for engaging, directing, and coordinating an exceptional and comprehensive architectural design and engineering team (the Design Professional’s or A/E Team) to work closely with the East Side Library Project User Group, SPLOST Management Team, and stakeholders to provide development of plans and specifications and all appropriate peripheral design services necessary for complete, accurate and fully coordinated completion of the Project.

Details

Library - Public, New Construction.
Division 03 - Concrete, Concrete Forming, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry, Concrete Form Masonry Units.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork, Architectural Woodwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Insulation, Roof and Deck Insulation, Weather Barriers.
Division 08 - Openings, Doors and Frames, Entrances, Storefronts, and Curtain Walls, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Resilient Flooring, Carpeting, Acoustic Treatment, Painting.
Division 10 - Specialties, Visual Display Units, Markerboards, Tackboards, Signage, Compartments and Cubicles, Toilet Compartments, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Flagpoles.
Division 11 - Equipment, Library Equipment, Library Stack Systems, Audio-Visual Equipment.
Division 12 - Furnishings, Window Treatments, Casework, Countertops, Rugs and Mats, Furniture, Institutional Furniture, Library Furniture, Book Shelves, Study Carrels, Index Card File Cabinets, Portable Audience Seating, Seat and Table Assemblies.
Division 13 - Special Construction.
Division 21 - Fire Suppression, Water-Based Fire-Suppression Systems.
Division 22 - Plumbing, Plumbing Piping, Facility Water Distribution, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers, Drinking Fountains.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.
Division 26 - Electrical, Medium-Voltage Electrical Distribution, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications.
Division 28 - Electronic Safety and Security, Intrusion Detection, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents