Similar Projects
Bayport Wire and HMP Repairs
Alteration
Bidding
Houston, TX

Mechanical, Electrical and Plumbing MEP (JOC)
Alteration
Bidding
Houston, TX

Off The Grid Solar Panel Based Renewable Energy System
Post-Bid
Houston, TX

1313 Main Street Standby Generator Project
Post-Bid
Houston, TX 77002

Preventive Maintenance and Repair Services for 138 KV Substations and Other High/Medium Voltage Electrical Equipment
Term Contract
Results
Houston, TX 77002

Generator Preventative Maintenance
Results
Houston, TX

Bayport Facility Electrical Maintenance Agreement
Term Contract
Bidding
Houston, TX

Furnish and Install Electric Actuators
Term Contract
Post-Bid
Houston, TX 77000

Electrical Maintenance Contractor
Results
Houston, TX 77033

Electric Service/Bucket and Lift Truck Service
Alteration
Bidding
Houston, TX

North west Harris County Municipal Utility District No 21 & 22 Water Well No. 2 Generator Improvements
Post-Bid
Less than $350,000 est. value
Houston, TX 77014

Relocation of Electrical Services and Related Items for Harris County
Term Contract
Results
Less than $1,559,000 est. value
Houston, TX 77002

Replacement of PVI Steam to Hot Water Generator
Post-Bid
Houston, TX 77054

LED Retrofit Project
Results
Houston, TX 77000

Electrical Wires, Cables
Post-Bid
Houston, TX 77251

Reported 10/15/2021 12:00 AM
Project Title

Bayport Facility Back Up Electrical Power Services

Physical Address View project details and contacts
City, State (County) Pasadena, TX 77507   (Harris County)
Category(s) Single Trades
Sub-Category(s) Electric
Contracting Method Competitive Bids.
Project Status Request for Proposals (RFPs)
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency - 09/13/21
Owner View project details and contacts
Architect View project details and contacts
Description

The Bay port plant has three separate 12470V feeders from Center Point to provide power. The west feed provides power to the lift stations, A-plant, the Belt Press building, and Tanks T-2004 and T-2005. The center feed provides power to the Admin and Maintenance buildings, B-Plant, 1st Step and 2nd Step Areas, and Clarifier 7 area. The east feed provides power to the Clarifier 4, 5, 6 area, cooling tower, and the outfall pumps (DTB area). All equipment utilization power is stepped down to 480V via various transformers throughout the plant. Energy delivery points located at critical MCC’s are to be provided for each of the three designated areas as separate facilities. The Proposer is responsible for the design, permitting (air,flood,etc.), supply, installation, maintenance, and operation of all emergency generation and emission control equipment, switch gear, pipes, lines and equipment required to convey the energy from the power generation system to the interface point including all equipment required to interface with the building systems.

Details

Division 26 - Electrical.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents