Similar Projects
Demolition of Wassom Middle School and Jackson Elementary School, Fort Campbell, KY
Demolition, Infrastructure
Sub-Bidding
$10,000,000 CJ est. value
Fort Campbell, KY 42223

Demolition Warren Co. P. 24, 25, 27, & 29
Demolition, Infrastructure
Sub-Bidding
$40,000 CJ est. value
Frankfort, KY 40601

Granular Activated Carbon (GAC) Contactor Media
Term Contract, Alteration
Post-Bid
Danville, KY

BCPWD 22/23-13 Mowing, Trimming, and Litter Removal
Term Contract, Alteration
Post-Bid
Burlington, KY

Asbestos Abatement at Tates Creek High School - Phase 2
Alteration
Results
Lexington, KY 40517

Wilmore Elevated Storage Tank Rehabilitation
Infrastructure, Alteration
Results
Wilmore, KY 40390

Demolition Jefferson Co. 05-323.01, 05-536.00, 05-804.00
Demolition, Infrastructure
Sub-Bidding
$125,000 CJ est. value
Frankfort, KY 40601

Custodial Services
Term Contract
Post-Bid
Louisville, KY 40202

City Facilities Dumpster Improvements
Renovation
Results
$107,000 est. value
Florence, KY

Demolition and Disposal of a Concrete Bridge
Demolition, Infrastructure
Sub-Bidding
$60,000 CJ est. value
Langley, KY 41645

Renovation of Kentucky State Capitol - BP02 4th Floor Abatement and Selective Demolition
Demolition, Alteration
Post-Bid
$50,000 est. value
Frankfort, KY 40601

Water Quality Infrastructure Maintenance Services
Alteration
Results
Louisville, KY

Asbestos Abatement Versailles Rd Property
Term Contract, Infrastructure
Sub-Bidding
$40,000 CJ est. value
Lexington, KY 40504

Nuisance Abatement
Alteration
Post-Bid
Lexington, KY

Asbestos Abatement
Term Contract, Alteration
Results
Lexington, KY 40508

Last Updated 09/18/2023 10:09 AM
Project Title

Fort Boonesborough Beach Building Demolition

Physical Address View project details and contacts
City, State (County) Richmond, KY 40475   (Madison County)
Category(s) Single Trades
Sub-Category(s) Environmental
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected July 2023
Bids Due View project details and contacts
Estimated Value $67,350 [brand] Estimate
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

**As of August 10, 2023, this project has not yet been awarded. A timeline for award has not yet been established.** The intent of this project is to demolish the existing Beach Building at Fort Boonesborough State Park in Richmond, Kentucky. The building has been surveyed for and remediated of all known hazardous materials. The demolition is to include removal of the entire building including foundations and associated utility connections. All site interventions, other than one monument noted on drawings, from the parking lot to the beach are to be removed. This includes sidewalks, steps and railings. After demolition of the building is complete, the site shall be returned to a natural appearing, mow-able condition. Construction drawings for the Beach Building are included for reference only.

Details

Division 01 - General Requirements, Special Procedures, Environmental Procedures.
Division 02 - Existing Conditions, Environmental Assessment, Hazardous Material Assessment, Site Remediation, Asbestos Remediation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents