Similar Projects
2022 Capital Improvements Bond Projects - City of Little Rock
New Construction, Infrastructure
Conception
$161,800,000 CJ est. value
Little Rock, AR 72201

2022 Capital Improvements Bond Projects - City of Little Rock
New Construction, Infrastructure
Conception
$161,800,000 CJ est. value
Little Rock, AR 72201

Contractor - John L. McClellan (JLM) Memorial Veterans Hospital | RAD Room Site Prep, Room 10
Renovation, Infrastructure
Design
$25,000 to $100,000 est. value
Little Rock, AR 72205

JP Wright Loop Rd. Rail Grade Separation (S)
Infrastructure
Bidding
$15,000,000 CJ est. value
Jacksonville, AR 72076

JP Wright Loop Rd. Rail Grade Separation (S)
Infrastructure
Bidding
$15,000,000 CJ est. value
Jacksonville, AR 72076

Wellington Hills Apartments
New Construction, Infrastructure - 56,482 SF
Sub-Bidding
$85,000,000 CJ est. value
Little Rock, AR 72201

Wellington Hills Apartments
New Construction, Infrastructure - 56,482 SF
Sub-Bidding
$85,000,000 CJ est. value
Little Rock, AR 72201

2021 Asphalt Overlay Program
Post-Bid
Sherwood, AR

2021 Asphalt Overlay Program
Infrastructure
Post-Bid
Jacksonville, AR

2021 Street Resurfacing Program
Results
North Little Rock, AR

River Mountain Parking Lot Construction
Infrastructure
Results
$11,500 est. value
Little Rock, AR

Taxiway Charlie Reconstruction Program - Phase 2
Infrastructure
Construction
$70,754,110 CJ est. value
Little Rock, AR 72202

Taxiway Charlie Reconstruction Program - Phase 2
Infrastructure
Construction
$70,754,110 CJ est. value
Little Rock, AR 72202

Quapaw Subdivision - Master Plan
New Construction
Pending Verification
North Little Rock, AR

Maverick Addition
New Construction, Infrastructure
Pending Verification
$1,000,000 CJ est. value
North Little Rock, AR 72117

Last Updated 09/26/2022 09:40 AM
Project Title

Wilson Water Treatment Plant Pavement Repair 2022

Physical Address View project details and contacts
City, State (County) Little Rock, AR 72212   (Pulaski County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Paving/Reconstruction, Sewage Treatment Plant, Sidewalks/Parking Lot, Site Development
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected November 2022
Bids Due View project details and contacts
Estimated Value $80,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Wilson Water Treatment Plant Pavement Repair 2022 Construct 700 Sqyd - 8inch Concrete Slab Little Rock, AR Direct Any Bid Questions to Joseph T. Ohara of Central Arkansas Water at (501) 377-1338 or at Joe.ohara@carkw.com. All Bids Must Be Accompanied by a Certified Check or Bid Bond in an Amount Equal to at Least 5% of the Total Bid. The Commission Reserves the Right to Waive Formalities, Reject Any or All Bids, and to Accept the Bid Deemed to Serve the Best Interest of Central Arkansas Water.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows, Hardware.
Division 09 - Finishes, Painting and Coating.
Division 10 - Specialties, Signage, Compartments and Cubicles, Emergency Aid Specialties, Fire Protection Specialties, Storage Assemblies.
Division 11 - Equipment, Laboratory Equipment.
Division 14 - Conveying Equipment.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Distributed Audio-Video Communications Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Intrusion Detection, Electronic Surveillance, Electronic Detection and Alarm.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Division 44 - Pollution and Waste Control Equipment, Common Work Results for Pollution and Waste Control Equipment, Air Pollution Control, Noise Pollution Control, Odor Control, Water Pollution Control Equipment, Solid Waste Control and Reuse, Waste Thermal Processing Equipment, Fluidized Bed Combustion Equipment, Rotary Kiln Incinerators, Pyrolysis Equipment, Hazardous Waste and Medical Waste Incinerators, Heat Recovery Equipment for Waste Thermal Processing, Synthesis Gas Cleanup and Handling Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents