Similar Projects
Langley Park Community Center- Trail/Park - 4.99.0090 - Prince George's County
Infrastructure
Conception
$1,000,000 est. value
Hyattsville, MD 20783

Indefinite Delivery/Indefinite Quantity Electronic Security Systems (ESS) 7th Generation
Term Contract
Design
Less than $675,000,000 est. value

RFP - Architectural / Engineering Services for Indefinite Delivery Contract (IDC)
Term Contract
Bidding
College Park, MD 20740

RFP - Small Business Reserve Procurement Full Service Architectural / Engineering Services for Indefinite Delivery Contract (IDC)
Term Contract
Bidding
College Park, MD 20740

On-Call Concrete Services
Term Contract
Sub-Bidding
College Park, MD 20740

Electronic (LED) Displays Installation
Infrastructure
Sub-Bidding
$300,000 CJ est. value
Bowie, MD 20715

On-Call General Contracting Services for Small Projects
Term Contract
Post-Bid
College Park, MD 20742

Turnkey Solar Power System
Post-Bid
Hyattsville, MD

Generator Maintenance Services
Alteration
Results
Bowie, MD

Bowie State University Communication Arts and Humanities Building
New Construction
Results
Bowie, MD 20715

UMD - Chemistry Wing 1 Replacement
New Construction - 105,500 SF
Construction
$108,000,000 est. value
College Park, MD

Price Communication Arts and Humanities Building - Bowie State University
Renovation - 183,643 SF
Construction
$107,000,000 CJ est. value
Bowie, MD 20715

Solar Panel Installations for Merkle Wildlife Sanctuary
Renovation
Sub-Bidding
$30,000 CJ est. value
Upper Marlboro, MD 20772

Electrical Maintenance Marlboro Maintenance Facility
Term Contract
Post-Bid
Less than $50,000 est. value
Upper Marlboro, MD

Generator and Maintenance Services
Term Contract
Results
Beltsville, MD 20705

Last Updated 08/08/2022 03:06 PM
Project Title

On-Call Large Electrical Projects

Physical Address View project details and contacts
City, State (County) College Park, MD 20740   (Prince Georges County)
Category(s) Education, Single Trades
Sub-Category(s) College/University, Electric
Contracting Method Competitive Bids
Project Status Construction start expected September 2022
Bids Due View project details and contacts
Estimated Value
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

The University of Maryland seeks electrical contractors capable of staffing and performing projects valued in excess of $200K DEADLINE FOR QUESTIONS: July 28, 2022 11:59PM Requests for clarification or additional information must be made in writing to the Procurement Officer and received at the Issuing Office no later than July 28, 2022 by 11:59PM. Such requests should contain the following: "Questions: RFP # 120059". Only written communications relative to the procurement shall be considered. Electronic mail to Elliott1@umd.edu is acceptable method for submission of questions. It is incumbent upon the Contractor to verify University receipt of their questions. Due to the "On-call" nature of this procurement, a five percent (5%) proposal bond is not required. The proposer to whom a "Task Order" in excess of $100,000 is awarded must furnish Performance and Payment Bonds, each in the amount of one hundred percent (100%) of the Task order amount, including executed Change Orders. These Performance and Payment Bonds must be provided at the time of the signing of the Task Order, and prior to the start of any work. Cost for any bonds apply to the cumulative total of the work in progress under a given on call/time and material not to exceed contract but rather to a single project. The awardee will have 10 days to return the Payment and Performance Bonds to the Procurement Officer after receipt of the Notice of Award, which will be prior to issuing the Task Order. The initial contract is to be for a period of (2) years from date of award. The University retains, at its sole discretion, the right to renew any resulting contract(s) for four (4) additional one-year periods The University reserves the right to reject any and all proposals, or to accept any proposal, when it is in the best interest of the State of Maryland. For the same reason, the University reserves the right to waive any technicality or minor irregularity in a proposal.

Details

Division 03 - Concrete, Cast-in-Place Concrete, Concrete Finishing, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Insulation, Weather Barriers.
Division 08 - Openings, Specialty Doors and Frames, Entrances, Automatic Entrances, Windows, Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Acoustical Ceilings, Acoustical Ceiling Suspension Assemblies, Flooring, Painting.
Division 10 - Specialties, Visual Display Units, Signage, Compartments and Cubicles, Toilet Compartments, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Protective Covers, Flagpoles, Flags and Banners.
Division 11 - Equipment, Foodservice Storage Equipment, Food Preparation Equipment, Food Cooking Equipment, Food Dispensing Equipment, Service Line Equipment, Soda Fountain Equipment, Coffee and Espresso Equipment, Ice Machines, Cleaning and Disposal Equipment, Library Equipment, Audio-Visual Equipment, Laboratory Equipment, Broadcast, Theater, and Stage Equipment, Athletic and Recreational Equipment, Athletic Equipment, Play Field Equipment and Structures, Exterior Court Athletic Equipment, Athletic Field Equipment.
Division 12 - Furnishings, Window Treatments, Casework, Countertops, Rugs and Mats, Office Furniture, Seating, Institutional Furniture, Classroom Furniture, Library Furniture, Book Shelves, Multiple Seating.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Plumbing Insulation, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Central Heating Equipment, Central Cooling Equipment.
Division 26 - Electrical, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting, Roadway Lighting, Area Lighting, Flood Lighting, Exterior Athletic Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Call Management, Audio-Video Communications, Distributed Audio-Video Communications Systems, Paging Systems, Public Address Systems.
Division 28 - Electronic Safety and Security, Access Control, Electronic Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Clearing and Grubbing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Athletic and Recreational Surfacing, Fences and Gates, Planting Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents