Similar Projects
General Contractors for Massabesic High School East Special Education Renovations
Renovation
Post-Bid
Waterboro, ME 04087

York School Department ADA Upgrades
Renovation
Post-Bid
York, ME

CTE Renovations
Results
Harrington, ME 04643

Orono High School And ASA Adams Elementary School Renovations and Additions
New Construction, Renovation, Addition - 36,000 SF
Results
Less than $12,500,000 est. value
Orono, ME

John F Murphy Private School
New Construction - 41,400 SF
Construction
$5,000,000 to $10,000,000 CJ est. value
Lewiston, ME 04240

Yarmouth High School Additions and Renovations
Renovation, Addition - 27,500 SF
Construction
Yarmouth, ME

Dedham School Bathroom Renovations
Renovation
Post-Bid
Dedham, ME 04429

Maintenance Building General Contractor Services
Results
Kennebunk, ME

Orono High School Administrative Office Renovation
Renovation
Post-Bid
Less than $150,000 est. value
Orono, ME 04473

Construction of Leonard Middle School Cafeteria Expansion
Addition
Results
Old Town, ME 04468

General Contractors for RSU 24 Charles M. Sumner Learning Campus
New Construction - 105,000 SF
Results
Less than $34,847,000 est. value
Sullivan, ME

Renovations to Auburn Middle School
Renovation
Results
Auburn, ME 04210

Pleasant Hill School Portable Classroom
Results
Less than $50,000 est. value
Scarborough, ME 04074

Portable Classroom Sale and Removal
Results
Corinth, ME 04427

Building Clerk of the Works - Charles M. Sumner Learning Campus
New Construction - 105,000 SF
Results
Sullivan, ME

Last Updated 06/23/2021 10:40 AM
Project Title

Messalonskee High School Locker Room Renovations Project

Physical Address View project details and contacts
City, State (County) Oakland, ME 04963   (Kennebec County)
Category(s) Education
Sub-Category(s) Middle/Senior High School
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The Project consists of interior renovations including but not limited to new ADA showers and locker room improvements at Messalonskee High School.

Details

Middle/Senior High School, Renovation.
Division 01 - General Requirements.
Division 02 - Existing Conditions.
Division 03 - Concrete, Concrete Forming, Concrete Reinforcing, Cast-in-Place Concrete.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Metal Doors and Frames, Specialty Doors and Frames, Entrances and Storefronts, Windows, Mirrors, Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Resilient Flooring, Carpeting, Painting.
Division 10 - Specialties, Visual Display Units, Chalkboards, Markerboards, Tackboards, Signage, Compartments and Cubicles, Toilet Compartments, Shower and Dressing Compartments, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Flagpoles.
Division 12 - Furnishings, Window Treatments, Casework, Furniture, Multiple Seating.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures, Commercial Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), HVAC Insulation, Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents