Similar Projects
Hallmark Property Development - Warrior
New Construction, Infrastructure
Conception
$10,000,000 CJ est. value
Warrior, AL 35180

Green Meadows Apartments Mixed-use Development
New Construction, Infrastructure
Conception
$100,000,000 CJ est. value
Bessemer, AL 35022

The Star Uptown / Carraway Hospital Redevelopment
Demolition, New Construction, Infrastructure, Renovation
Design
$300,000,000 CJ est. value
Birmingham, AL 35234

Southern Research Biotech Building
Demolition, New Construction, Infrastructure
Design
$30,000,000 CJ est. value
Birmingham, AL 35203

RFP Design - Brighton Storm Shelters
New Construction, Infrastructure
Bidding
$500,000 CJ est. value
Birmingham, AL 35233

Southtown Senior / Birmingham
New Construction, Infrastructure
Post-Bid
$10,000,000 CJ est. value
Birmingham, AL 35233

Village Creek Water Reclamation Facility Reliability and Biological Improvements - Phase 3
Renovation, Infrastructure
Post-Bid
$45,000,000 CJ est. value
Birmingham, AL 35224

UV Replacement and Miscellaneous Improvements
Renovation
Results
$10,318,155 est. value
Birmingham, AL

Cahaba River and Trussville WRF and AL SEIER Pump Station Phase 3 Improvements
Renovation
Results
$67,997,754 est. value
Birmingham, Trussville, AL 35244

Alamo Drafthouse Cinema
New Construction, Infrastructure - 50,000 SF
Construction
$10,000,000 CJ est. value
Birmingham, AL 35233

Starbucks (Shell) / Trussville
New Construction, Infrastructure - 2,500 SF
Construction
$650,000 CJ est. value
Trussville, AL 35173

Douglas Commons
New Construction, Infrastructure
Pending Verification
$12,000,000 CJ est. value
Hoover, AL 35226

Highland Avenue Mixed-Use Development
New Construction, Infrastructure
Pending Verification
$109,366,112 CJ est. value
Birmingham, AL 35205

Home2Suites Trussville
New Construction, Infrastructure
Conception
$25,000,000 CJ est. value
Trussville, AL 35235

Everlee - Village Center Future Phases
New Construction, Infrastructure - 600,000 SF
Design
$50,000,000 CJ est. value
Hoover, AL 35244

Last Updated 04/25/2023 12:26 PM
Project Title

Ultraviolet Disinfection Facility Improvements

Physical Address View project details and contacts
City, State (County) Birmingham, AL 35233   (Jefferson County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Sewage Treatment Plant, Site Development
Contracting Method Competitive Bids
Project Status Design Development, Construction start expected September 2023
Bids Due View project details and contacts
Estimated Value $720,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Jefferson County is making two new investments in a water reclamation facility for a total of over $3 million. As of April 25, 2023, the project is in Design Development. An Architect has not been selected. Information regarding a General Contractor and method of selection has not been disclosed. A Construction start date and timeframe has not been released.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows, Hardware.
Division 09 - Finishes, Painting and Coating.
Division 10 - Specialties, Signage, Compartments and Cubicles, Emergency Aid Specialties, Fire Protection Specialties, Storage Assemblies.
Division 11 - Equipment, Laboratory Equipment.
Division 14 - Conveying Equipment.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Distributed Audio-Video Communications Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Intrusion Detection, Electronic Surveillance, Electronic Detection and Alarm.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Division 44 - Pollution and Waste Control Equipment, Common Work Results for Pollution and Waste Control Equipment, Air Pollution Control, Noise Pollution Control, Odor Control, Water Pollution Control Equipment, Solid Waste Control and Reuse, Waste Thermal Processing Equipment, Fluidized Bed Combustion Equipment, Rotary Kiln Incinerators, Pyrolysis Equipment, Hazardous Waste and Medical Waste Incinerators, Heat Recovery Equipment for Waste Thermal Processing, Synthesis Gas Cleanup and Handling Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents