Similar Projects
Missouri River Recovery Program - Fawn Island Bank Stabilization
Renovation
Design
$1,000,000 to $5,000,000 est. value
Little Sioux, IA 51545

NCCF Food Warehouse Walk-In Freezer Replacement
Alteration
Bidding
Rockwell City, IA 50579

Mechanical Upgrades for the Dike- New Hartford CSD
Alteration
Bidding
Less than $100,000 est. value
Dike, New Hartford, IA 50624

Mississippi River Basin, Lock 19, Keokuk, Iowa, Plc And Hydraulic Cylinders
Renovation
Post-Bid
$1,000,000 to $5,000,000 est. value
Keokuk, IA 52632

CSD Indian Hills Junior High School - Boiler Replacement
Alteration
Post-Bid
Less than $425,000 est. value
Clive, IA 50325

Flood Control Levee Repair - 2021
Results
Dubuque, IA

Winnebago River Low Head Dam Mitigation - Winnebago Dam No. 1
New Construction
Results
Mason City, IA

Pedestrian Tunnel
New Construction
Pending Verification
$2,000,000 to $3,000,000 est. value
Cedar Rapids, IA

Grimes Public Library - Elevator
Renovation, Alteration
Bidding
Grimes, IA

Replacement of 126 Water Heaters
Alteration
Post-Bid
Corning, Creston, Lamoni, Lenox, Leon, Mount Ayr, Osceola, IA

Sioux City Convention Center Water Softener Replacement
Alteration
Results
Sioux Center, IA

University of Northern Iowa ITC - Request for Qualifications For Mechanical & Electrical Contractors
Renovation, Addition, Alteration - 87,197 SF
Post-Bid
Cedar Falls, IA

Ridgeway Towers Boiler Replacement
Alteration
Results
Waterloo, IA 50701

Law Enforcement Center Rooftop Mechanical Replacement
Alteration
Post-Bid
Algona, IA 50511

Camp Dodge Building M-15
Renovation, Alteration
Results
Johnston, IA 50131

Reported 03/10/2022 12:00 AM
Project Title

WRC Decentralization - Construction Management Services

Physical Address View project details and contacts
City, State (County) Des Moines, Woodward, IA 50276 (Boone, Polk Counties)
Category(s) Heavy and Highway, Single Trades
Sub-Category(s) Dam/Tunnel, Mechanical
Contracting Method Competitive Bids.
Project Status Request for Proposals (RFPs)
Bids Due View project details and contacts
Estimated Value $32,750,000
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Design, construction and closeout of all phases of the campus decentralization project at the Woodward Resource Center. Evaluate the centralized campus utility distribution and tunnel system at the Woodward Resource Center. The Woodward Resource Center is served by a centralized steam plant and utility distribution system that primarily consists of tunnels that were constructed in the mid-1960s. The original boilers are still in operation. Steam is also used by absorption chillers to provide a portion of the air conditioning for the campus. The study reviewed the existing conditions and recommended a full decentralization of the utilities, in lieu of repair/replacement of existing equipment and tunnels or a hybrid approach.

Details

Dam/Tunnel, Renovation.
Division 02 - Existing Conditions, Subsurface Investigation.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Heating Boilers.
Division 31 - Earthwork, Site Clearing, Grading, Excavation and Fill, Subgrade Preparation, Excavation, Shoring, Tunneling and Mining, Tunnel Excavation.
Division 35 - Waterway and Marine Construction, Dam Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents