Similar Projects
Replacement of the Sand Hill Water Storage Tank
Design
Less than $2,070,000 est. value
Cottekill, NY

Wards Island WWTP Primary Tanks Reconstruction
Infrastructure
Bidding
$70,888,504 to $95,907,976 est. value
Flushing, NY

Roof Water Tank Replacement - Mill Brook Houses
Infrastructure
Bidding
$150,000 est. value
New York, NY

Fluoride System Upgrade at Reeves Newsom Water Service Station
Post-Bid
Scarsdale, NY 10583

Water Storage Tank Replacement at Arcadia Hills Water District
Post-Bid
Less than $754,000 est. value
Goshen, NY

World-Wide Water Storage Tank Remediation
Term Contract
Results

World-Wide Water Storage Tank Remediation
Term Contract
Results

Water Distribution Storage Tank - Phase 1 at Ray Brook WD
Infrastructure
Bidding
North Elba, NY

NCCWD - Water District Water Main Improvements, Water Storage Tank Improvements and Pump Station
Renovation
Post-Bid
Dunkirk, Sheridan, NY

Lake Water System Improvements Project - Contract No. 3 - Spray Aeration Treatment
Results
Less than $225,000 est. value
Round Lake, NY 12151

Water System Improvements
Post-Bid
Hancock, NY

STL Water Tower Replacement
Results
Massena, NY 13662

Storage Tank and Transfer Equipment Testing and Monitoring Service
Alteration
Post-Bid
Buffalo, NY

Wayne County Regional Water Storage
Results
Less than $1,600,000 est. value
Walworth, NY 14568

Repairing Gravity Roof Tanks - Citywide
Infrastructure
Post-Bid
New York, NY 10065

Last Updated 04/11/2022 03:35 PM
Project Title

Oil Water Separator Cleaning

Physical Address View project details and contacts
City, State (County) Newburgh, NY 12550   (Orange County)
Category(s) Sewer and Water
Sub-Category(s) Storage/Water Tanks
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from Federal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Perform cleaning of several oil/water separators: - S-1 Building 100 Aircraft Maintenance - S-9 Building 301 USMC Aircraft Corrosion Control

Details

Division 01 - General Requirements, Cleaning and Waste Management, Final Cleaning.
Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete.
Division 05 - Metals, Structural Metal Framing, Metal Decking.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Facility Fuel Piping, Facility Fuel-Storage Tanks.
Division 31 - Earthwork, Clearing and Grubbing, Grading.
Division 32 - Exterior Improvements, Fences and Gates.
Division 33 - Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents