Similar Projects
Wastewater Treatment Plant Construction
New Construction
Design
Sterling, IL

Disc Filters Installation
New Construction
Bidding
$9,000,000 est. value
Hanover Park, Schaumburg, IL 60193

Red Hills State Park Replace Campground Sewage Treatment
Renovation
Bidding
$1,967,800 est. value
Sumner, IL 62466

Wastewater Treatment Facility Controls Upgrade
Post-Bid
Davis Junction, IL

Sewage Treatment Plant
Post-Bid
Hudson, IL 61748

Nordic Wastewater Treatment Plant Rehabilitation
Renovation
Results
$6,000,000 to $8,000,000 est. value
Itasca, IL 60143

DOC-LAW Bar Screen Equipment Refurbish and Repair
Results
Sumner, IL 62466

Huntley East WTF UV Modifications
Renovation, Alteration
Bidding
Huntley, IL 60142

Bar Screen Replacement Project
Renovation
Post-Bid
Toluca, IL

Wastewater Treatment Plant Improvements
Results
Tilton, IL 61833

Wastewater Treatment Facility UV Disinfection
Infrastructure
Post-Bid
Metropolis, IL

Wastewater Treatment Plant Repairs Aerobic Digester Rehabilitation
Results
Rockton, IL 61072

Electric Motor Rehabilitation
Renovation
Post-Bid
$380,000 est. value
Chicago, IL

West Side Water Reclamation Facility 2020 Phase III Expansion
Results
$16,000,000 to $20,000,000 est. value
Saint Charles, IL 60175

Repair and Replacement of Certain Portions of the Sludge De-Watering Building
Renovation
Post-Bid
$200,000 est. value
Chillicothe, IL

Last Updated 02/08/2022 04:28 AM
Project Title

D7 Lagoon Wastewater System Services

Physical Address View project details and contacts
City, State (County) (Clark, Effingham Counties)
Category(s) Sewer and Water
Sub-Category(s) Sewage Treatment Plant
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Details

Sewage Treatment Plant, New Construction.
Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows, Hardware.
Division 09 - Finishes, Painting and Coating.
Division 10 - Specialties, Signage, Compartments and Cubicles, Emergency Aid Specialties, Fire Protection Specialties, Storage Assemblies.
Division 11 - Equipment, Laboratory Equipment.
Division 14 - Conveying Equipment.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Distributed Audio-Video Communications Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Intrusion Detection, Electronic Surveillance, Electronic Detection and Alarm.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Division 44 - Pollution and Waste Control Equipment, Common Work Results for Pollution and Waste Control Equipment, Air Pollution Control, Noise Pollution Control, Odor Control, Water Pollution Control Equipment, Solid Waste Control and Reuse, Waste Thermal Processing Equipment, Fluidized Bed Combustion Equipment, Rotary Kiln Incinerators, Pyrolysis Equipment, Hazardous Waste and Medical Waste Incinerators, Heat Recovery Equipment for Waste Thermal Processing, Synthesis Gas Cleanup and Handling Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents