Similar Projects
Restripe Parking Lot and Area
Alteration
Bidding
Dallas, TX 75220

Forest Hills Ramps Construction
Infrastructure
Bidding
Duncanville, TX 75116

CRWS Maintenance Parking Improvements
Post-Bid
Dallas, TX 75212

Streetscape and Sidewalk Repair
Post-Bid
TX 75200

Wagging Tail Dog Park - Parking Improvements
Results
$256,793 est. value
Dallas, TX 75248

Kinwest Debris Interceptors
Results
$375,407 est. value
Irving, TX 75060

Walmart Supercenter #3224-256 - Ogp-Ce
Renovation - 850 SF
Construction
Less than $7,161 est. value
Garland, TX 75043

Parking Lot Repair
Infrastructure
Construction
Dallas, TX 75224

2022 Dallas Sidewalk Master Plan Improvements Contract
Term Contract
Bidding
Dallas, TX

Annual Contract for Sidewalk, Handicapped Ramps, Drive Approaches and Curb and Gutter Replacement
Term Contract
Post-Bid
$300,000 est. value
Mesquite, TX

Dallas Love Field Entry Road Enhancements
Results
$13,060,705 est. value
Dallas, TX

Coombs Creek Trail Improvements
Infrastructure
Bidding
Dallas, TX

Polyurethane Foam Injection- Concrete Leveling
Term Contract
Post-Bid
Irving, TX

Asbury Manor Trail Intersection Improvements
Results
$50,000 to $75,000 est. value
Coppell, TX 75019

Reclamation and Resurfacing of Parking Lots at Irwin Park and Guy Berry Park
Infrastructure
Post-Bid
Balch Springs, TX 75180

Reported 02/12/2022 12:00 AM
Project Title

Collective Sustainable Development Infrastructure Project

Physical Address View project details and contacts
City, State (County) Dallas, TX   (Dallas County)
Category(s) Heavy and Highway
Sub-Category(s) Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Construction of barrier free sidewalk ramps and bike lanes on Fort Worth Avenue from Bahama Drive to IH30, on Colorado Boulevard from Fort Worth Avenue to Hampton Road, and on Bahama Drive from Fort Worth Avenue to Plymouth Road; intersection improvements including traffic signal upgrades at Fort Worth Avenue and Bahama Drive; bicycle pedestrian shared-use path on Plymouth Road to connection to the Coombs Creek Trail in the City of Dallas.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.
Division 34 - Transportation, Roadway Signaling and Control Equipment, Traffic Signals.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents