Similar Projects
On Call Roof Maintenance and Repair Services
Term Contract
Sub-Bidding
Yonkers, NY 10701

Port Chester-rye Ufsd Roof Replacement, Masonry Repairs and Related Work at Park Avenue Es School and Port Chester Hs
Renovation
Sub-Bidding
$380,000 CJ est. value
Port Chester, NY 10573

Roofing Replacement at Parsons Elementary School
Renovation
Post-Bid
$700,000 CJ est. value
Harrison, NY 10528

Replace Roofs, Buildings 1, 2, 4 and 110B at Bedford Hills CF
Post-Bid
$2,000,000 to $3,000,000 est. value
Bedford Hills, NY 10507

Restoration and Repair of a Covered Canopy and Related Work at the Anthony J. Posillipo Community Center
Results
Rye Brook, NY 10573

Weight Room Roof Replacement and Related Work at Port Chester HS
Results
Port Chester, NY 10573

Roof Replacement - Contract #2 Renovations and Related Work - Park Avenue Elementary School and Port Chester High School
Renovation
Sub-Bidding
$800,000 CJ est. value
Port Chester, NY 10573

2021-2022 District Wide Roofing Services
Term Contract
Post-Bid
NY

Roof Repair
Results
Pelham, NY

Westchester Community College Maintenance III Roof Replacement
Renovation
Sub-Bidding
$800,000 CJ est. value
Valhalla, NY 10595

District Wide Roof Services
Post-Bid
Rye, NY

Eastchester UFSD 2020-2021 Eastchester Middle School/High School Roof Replacements Project
Results
Eastchester, NY 10709

Odell House Restoration: Roof Repairs and Replacement
Renovation
Sub-Bidding
$800,000 CJ est. value
Hartsdale, NY 10530

Residential Property Improvements
Post-Bid
Peekskill, NY 10566

District Wide Roof Repairs
Results
Scarsdale, NY

Last Updated 08/19/2022 06:03 PM
Project Title

Hastings-On-Hudson Public Library Roofing Project

Physical Address View project details and contacts
City, State (County) Hastings on Hudson, NY 10706   (Westchester County)
Category(s) Single Trades
Sub-Category(s) Roofing
Contracting Method Competitive Bids
Project Status Construction start expected September 2022
Bids Due View project details and contacts
Estimated Value $800,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

This roofing project will retain as much of the existing roof components to avoid sending material to the landfill. The existing flat roof was installed using the Inverted Roof Membrane Assembly. The existing ballast and Styrofoam insulation will be re-used. The existing BUR membrane will be overlaid with Siplast Paradiene 20 TG and Teranap. Base-flashings will be removed but are not ACRM; new flashing will be Veral or Parapro. The installation will be covered by a 20-year manufacturer's warranty. The roof area is approximately 7, 725 sq. ft. General Requirements - Insurance Required - Prevailing Wage Required Bonding Requirements - Bid Bond 5 % - Performance Bond 100 % - Maintenance Bond 100 % - Labor and Materials Bond 100 % Job Location 7 Maple Avenue, Hastings-on-Hudson, NY 10706 Question Acceptance Deadline 08/15/2022 04:00 PM EDT Questions are submitted online Yes

Details

7,725 SF.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents