Similar Projects
Road Resurfacing Year 5
Infrastructure
Bidding
SC

Asphalt Rejuvenator
Infrastructure
Bidding
Beaufort, SC

Cross Island Parkway (US 278) Toll Conversion Design-Build Project
Post-Bid
SC

Roadway Improvements for Brooks Willis Drive
Infrastructure
Post-Bid
Hardeeville, SC

Rehabilitation - District 6
Results

Rehabilitation - District 6
Results

Dirt Road Paving Contract #53
Infrastructure
Bidding
Beaufort, SC

Roadway and Intersection Improvements
Infrastructure
Post-Bid
Hardeeville, SC

Repaving Schinger Avenue
Results
Ridgeland, SC 29936

Preservation - District 6
Infrastructure
Bidding

Campus Demolition Projects - Ridgeland and Hardeeville
Demolition, Infrastructure
Post-Bid
Hardeeville, Ridgeland, SC 29927

Rehabilitation/Reconstruction - District 6
Results

Full Depth Patching-District 6
Results

Road Resurfacing Year 4 Projects
Results
Beaufort, SC

Road Resurfacing Year 4 Projects - Asphalt Rejuvenator
Results
Beaufort, SC

Last Updated 01/12/2022 07:25 AM
Project Title

Reconstruction/Rehabilitation - Beaufort/Jasper Co

Physical Address View project details and contacts
City, State (County) (Beaufort, Jasper Counties)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Mobilization 1.000 Ls Bonds And Insurance 1.000 Ls Construction Stakes, Lines & Grades 19.000 Ea Traffic Control 1.000 Ls Removal & Disposal Of Existing Pavement 802.560 Sy Unclassified Excavation 155.000 Cy Borrow Excavation 6,133.500 Cy Excavation For Shoulder Paving 80.300 Sta Hauling Of Excavated Shoulder Material 80.300 Sta Additional Rock For Full Depth Reclamation 3,332.500 Ton Cement Modified Recycled Base (10" Unif)-Curing Method b 59,372.230 Sy Cement Modified Recycled Base (12" Unif)-Curing Method b 108,694.907 Sy Portland Cement For Cement Modified Recycled Base Course 6,588.860 Ton Maintenance Stone 119.995 Ton Hma Shoulder Widening Course 299.200 Ton Liquid Asphalt Binder Pg64-22 1,680.169 Ton Full Depth Asph. Pav. Patching 6" Unif. 1,426.520 Sy Full Depth Asph. Pav. Patching 8" Unif 10,573.000 Sy Milling Existing Asphalt Pavement 1.5" 15,846.650 Sy Milling Existing Asphalt Pavement 1.75" 18,104.800 Sy Milling Existing Asphalt Pavement 2.0" 38,163.910 Sy Milling Existing Asphalt Pavement 4.0" 6,450.000 Sy Milling Existing Asphalt Pavement (Variable) 37,981.330 Sy Milled-In Rumble Strip 19.420 Mi Hot Mix Asphalt Surface Course Type b 20,553.420 Ton Hot Mix Asphalt Surface Course Type c 5,246.325 Ton Hot Mix Asphalt Surface Course Type e 746.630 Ton Driveway Paving-Surface Type c 1,792.875 Ton Warm Mix Asphalt Intermediate Course Type b - Special 792.000 Ton Permanent Construction Signs (Ground Mounted) 4,905.250 Sf Pave. Mark.(Temp-Paint)12inx18in White Triangle Yield Bar 56.000 Lf 4" White Broken Lines(Gaps Excl.)Perm.Pvmt.Marking 2,160.000 Lf 4" White Solid Lines (Pvt. Edge Lines) Perm.Pvmt.Marking 110,765.000 Lf 8" White Solid Lines Perm.Pvmt.Markings 2,149.000 Lf 12in x 18in White Triang. Yield Bar (Gaps Exc)Perm.Pvmt.Mark 14.000 Lf 24" White Solid Lines (Stop/Diag Lines)-Perm.Pvmt.Marking 1,201.000 Lf White Single Arrows (Lt, Strght, Rt) Perm.Pvmt.Marking 14.000 Ea White Single Fish Hook Arrow Perm.Pvmt.Marking 4.000 Ea White Word Message "Only" -Perm.Pvmt.Marking 16.000 Ea White Lane Drop Arrow(Lt.Or Rt.)Perm.Pvmt.Marking 2.000 Ea 4" Yellow Broken Lines(Gaps Exc)Perm.Pvmt.Marking 9,340.000 Lf 4" Yellow Solid Lines(Pvt.Edge Lines) Perm.Pvmt.Marking 82,615.000 Lf 4" White Broken Lines -(Gaps Excluded)-Fast Dry Paint 7,164.000 Lf 4" White Solid Lines (Pvt. Edge Lines)-Fast Dry Paint 394,821.000 Lf 8"White Solid Lines(Crosswalk&Channelization)Fast Dry Paint 7,041.000 Lf 24" White Solid Lines (Stop/Diagonal Lines)-Fast Dry Paint 3,782.000 Lf White Single Arrow (Left, Straight, Right)-Fast Dry Paint 64.000 Ea White Word Message "Only"-Fast Dry Paint 58.000 Ea White Lane Drop Arrow (Left Or Right)-Fast Dry Paint 8.000 Ea 4" Yellow Broken Lines(Gaps Exc) - Fast Dry Paint 33,720.000 Lf 4"Yellow Solid Line(Pvt.Edge&No Passing Zone)-Fast Dry Paint 277,377.000 Lf 6" Yellow Solid Line On Curb/Median - Fast Dry Paint 1,082.000 Lf Permanent Clear Pavement Markers- Mono-Dir.- 4"x4" 117.000 Ea Permanent Yellow Pavement Markers Mono-Dir.- 4"x 4" Perm. Yel. 60.000 Ea Permanent Yellow Pavement Markers Bi-Dir.- 4"x4" 1,187.000 Ea Furnish & Install 1.0" Schedule 80 Pvc Conduit 300.000 Lf Furnish & Instl No. 14 Copper Wire,1-Conductor For Loop Wire 4,500.000 Lf Sawcut For Loop Detector 2,156.000 Lf Adjust Catch Basin 1.000 Ea Adjust Drop Inlet Adjust d. i. 5.000 Ea Concrete Curb And Gutter(1'-6") Ogee 50.000 Lf Concrete Sidewalk(4" Uniform) 298.120 Sy Concrete Sidewalk(6" Uniform) 56.660 Sy Detectable Warning Material 170.000 Sf Concrete Driveway(6" Uniform) 36.670 Sy Concrete Median 111.110 Sy Pedestrian Ramp Construction 300.000 Sy Surface Applied Detectable Warning 200.000 Sf Remove & Dispose Semi-Rigid Gr Device 625.500 Lf Premash w-Beam Strong Post System Wsp3 250.000 Lf Premash Type t Tl3 Leading 50' 10.000 Ea Permanent Grassing For Non-Permitted Resurfacing Projects 13.750 Acre Silt Fence 1,727.000 Lf

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents