Similar Projects
Sewer Reconstruction - City of Madison
Build-out, Infrastructure
Conception
$2,551,000 CJ est. value
Madison, WI 53715

Elderberry Place Project
New Construction, Infrastructure
Conception
$19,100,000 CJ est. value
Madison, WI 53717

Dane County Jail South Tower Addition & Public Safety Building Renovation
Addition, Demolition, Renovation, Infrastructure - 170,000 SF
Design
$170,000,000 CJ est. value
Madison, WI 53703

Belle Farm / Middleton
New Construction, Infrastructure
Design
$1,500,000 CJ est. value
Middleton, WI 53562

Olin-Turville Court and East Lakeside Street Resurfacing Water Utilities
Infrastructure
Bidding
$700,000 CJ est. value
Madison, WI 53715

Olin-Turville Court and East Lakeside Street Resurfacing Water Utilities
Infrastructure
Bidding
$700,000 CJ est. value
Madison, WI 53715

Burnett County Public Safety Facility Addition and Renovation
Addition, Demolition, Renovation, Infrastructure
Post-Bid
$32,600,000 CJ est. value
Siren, WI 54872

Sewer and Water Maintenance
Term Contract
Post-Bid
Beloit, WI

2021 Street and Utility Improvements
Infrastructure
Results
Dorchester, WI

Colby Community Drive
Infrastructure
Results
Colby, WI 54421

Headquarters Roof Replacement
Renovation, Infrastructure
Construction
$2,282,538 CJ est. value
Madison, WI 53703

Sewers 1-22 Basin Repairs
Infrastructure
Construction
$1,086,000 CJ est. value
Green Bay, WI 54301

Oliv Madison
Demolition, New Construction, Infrastructure - 23,229 SF
Pending Verification
$100,000,000 CJ est. value
Madison, WI 53703

University Avenue Duplexes
Demolition, New Construction, Infrastructure
Pending Verification
$2,000,000 CJ est. value
Middleton, WI 53562

Town of Scott, Inglehart Road - Construct Ops/ Bridge Replacement
Demolition, New Construction, Infrastructure
Conception
$2,000,000 CJ est. value
Cambria, WI 53923

Last Updated 05/08/2023 03:19 PM
Project Title

2023 Birch Lake Dam #7 Repairs

Physical Address View project details and contacts
City, State (County) Barneveld, WI 53507   (Iowa County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Dam/Tunnel, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Construction start expected May 2023 , Construction documents
Bids Due View project details and contacts
Estimated Value $201,349 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

As of May 8th, 2023 this project has not been awarded. It will rebid in the spring of 2024. The proposed work consists of replacement of the existing 6" lake drain sluice valve with a 12" lift gate, replacement of the Two toe drain outlet pipes adjacent to the outlet pipe, and restoration of approximately 500' of wave berm on the lake side of the dam; erosion control, and any incidental items necessary to complete the work Est. Completion Date: Sept. 15, 2023 Pre-Bid Meeting Info: No Any questions regarding the bid documents may be directed to the engineer: Mr. Jeff Reynolds, PE, Jewell Associates Engineers, Inc., (715) 900-2658, or jeff.reynolds@jewellassoc.com

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 31 - Earthwork, Site Clearing, Grading, Excavation and Fill, Subgrade Preparation, Excavation, Shoring, Tunneling and Mining, Tunnel Excavation.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.
Division 35 - Waterway and Marine Construction, Dam Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents