Similar Projects
Last Updated | 05/08/2023 03:19 PM |
Project Title | 2023 Birch Lake Dam #7 Repairs |
Physical Address | View project details and contacts |
City, State (County) | Barneveld, WI 53507 (Iowa County) |
Category(s) | Heavy and Highway, Sewer and Water |
Sub-Category(s) | Dam/Tunnel, Site Development, Water Lines |
Contracting Method | Competitive Bids |
Project Status | Construction start expected May 2023 , Construction documents |
Bids Due | View project details and contacts |
Estimated Value | $201,349 [brand] Estimate |
Plans Available from | Civil Engineer |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | As of May 8th, 2023 this project has not been awarded. It will rebid in the spring of 2024. The proposed work consists of replacement of the existing 6" lake drain sluice valve with a 12" lift gate, replacement of the Two toe drain outlet pipes adjacent to the outlet pipe, and restoration of approximately 500' of wave berm on the lake side of the dam; erosion control, and any incidental items necessary to complete the work Est. Completion Date: Sept. 15, 2023 Pre-Bid Meeting Info: No Any questions regarding the bid documents may be directed to the engineer: Mr. Jeff Reynolds, PE, Jewell Associates Engineers, Inc., (715) 900-2658, or jeff.reynolds@jewellassoc.com |
||||||||
Details |
|
||||||||
Bidder's List | View project details and contacts | ||||||||
Prospective Bidders | View project details and contacts | ||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |