Similar Projects
Last Updated | 12/16/2021 05:30 AM |
Project Title | 1417 O Street Demolition Project |
Physical Address | View project details and contacts |
City, State (County) | Greeley, CO 80631 (Weld County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Demolition |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Bid is for the demolition of the house and outbuilding located at 1417 O Street, Greeley, CO 80631. 1. Demolition and removal of buildings, structures and foundations. 2. Removal of all trees and shrubbery. 3. Removal of all exterior concrete and items to create bare ground surface and sub-surface. 4. Demolition materials are to be removed from site and disposed of in accordance with applicable directives. 5. Removal of below-grade construction and utilities. Contractor is responsible for isolating the piping and electrical from street to the buildings. 6. Asbestos abatement is complete. 7. Fees for permits through Weld County will be waived. 8. Locate, identify, disconnect and seal/cap off utilities serving the buildings to be demolished, in accordance will local codes. 9. Removal of septic system is required. This includes complete removal of the septic tank and piping located on the site. Contractor is responsible for locating. Location is unknown. Inspection/certification for tank closure by Weld County Public Health Department is required. 10. Storage or sale of removed items or materials on-site is not permitted. 11. Work will comply with all applicable Federal, State and local laws, ordnances and regulatory requirements. 12. All hazardous materials (to include refrigerant) must properly be removed, evacuated, and disposed of by contractor during demolition process. 13. Refrigerant shall be removed, stored and disposed of in accordance with regulations. 14. The remaining hole/holes in the site pad will sloped or infilled with site material to mitigate any falls hazards. 15. Conduct building demolition and debris removal operations to ensure minimum interference with roads, streets, walkways, and adjacent occupied facilities. 16. Contractor is expected to enter into a contract. |
||
Details |
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |