Similar Projects
Amazon Sortation Facility - Project Oak / Atlanta
New Construction, Infrastructure - 3,200,000 SF
Design
$300,000,000 CJ est. value
Emerson, GA 30137

Amazon Sortation Facility - Project Oak / Atlanta
New Construction, Infrastructure - 3,200,000 SF
Design
$300,000,000 CJ est. value
Emerson, GA 30137

Construction of a Bridge and Approaches on US 41/SR 3 North and Southbound Over SR 293 and Csx Railroad
Demolition, New Construction, Infrastructure
Bidding
$8,000,000 CJ est. value
Cartersville, GA 30121

Construction of a Bridge and Approaches on US 41/SR 3 North and Southbound Over SR 293 and Csx Railroad
Demolition, New Construction, Infrastructure
Bidding
$8,000,000 CJ est. value
Cartersville, GA 30121

Pavement Evaluations for Interstate Maintenance
Alteration
Post-Bid
$25,000 est. value

Pickleball Courts at Dellinger Park
Infrastructure
Post-Bid
$40,000 CJ est. value
Cartersville, GA 30120

Health Department Renovation and Expansion
Addition, Demolition, Renovation, Infrastructure
Results
$5,199,000 CJ est. value
Cartersville, GA 30121

Milling, Inlay, Plant Mix Resurfacing and Shoulder Rehabilitation on SR 20
Infrastructure
Results
$2,241,810 CJ est. value
Cartersville, GA 30120

New Mission Road Elementary School
New Construction, Infrastructure - 102,635 SF
Construction
$30,000,000 CJ est. value
Cartersville, GA 30120

Dogwood Plaza / Adairsville
New Construction, Infrastructure - 7,260 SF
Construction
$1,500,000 CJ est. value
Adairsville, GA 30103

North Bartow Interchange Feasibility Study (New I75 interchange) - Bartow County
Infrastructure
Pending Verification
$5,000,000 CJ est. value
Cartersville, GA 30120

North Bartow Interchange Feasibility Study (New I75 interchange) - Bartow County
Infrastructure
Pending Verification
$5,000,000 CJ est. value
Cartersville, GA 30120

The Varsity / Cartersville
New Construction, Infrastructure - 4,449 SF
Post-Bid
$2,250,000 CJ est. value
Cartersville, GA 30121

Duluth Trading Company Fulfillment Center
New Construction, Infrastructure
Construction
$53,000,000 CJ est. value
Adairsville, GA 30103

U-Haul Moving and Storage/Retail / Cartersville
New Construction, Infrastructure - 90,000 SF
Pending Verification
$10,000,000 CJ est. value
Cartersville, GA 30120

Last Updated 03/27/2023 08:08 AM
Project Title

SR 3 / US 41 SB at SR 293 / CSX #340429d in Emerson

Physical Address View project details and contacts
City, State (County) Cartersville, GA 30121   (Bartow County)
Category(s) Heavy and Highway
Sub-Category(s) Bridge, Paving/Reconstruction, Site Development
Contracting Method Competitive Bids
Project Status Construction start expected July 2023 , Construction documents
Bids Due View project details and contacts
Estimated Value $6,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This project replaces the existing bridge on SR 3/ US 41 SB bridge over SR 293 in Bartow County. The project will utilize an on-site detour and will have a construction duration of approximately 24 months. This project will be constructed simultaneously with PI 0015534. County: Bartow As of March 16, 2023, the project is in Final Planning status. Anticipated letting Month is April, 2023. GADOT - SR 3 / US 41 SB at SR 293 / CSX #340429d in Emerson *Project information has been obtained through a public state transportation improvement plan (STIP). A STIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the STIP often evolves based on funding availability. The project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Concrete Reinforcing, Precast Structural Concrete.
Division 05 - Metals, Structural Steel Framing, Structural Steel for Bridges, Steel Joist Framing, Steel Joist Girder Framing.
Division 07 - Thermal and Moisture Protection, Expansion Control.
Division 09 - Finishes, High-Performance Coatings.
Division 10 - Specialties, Signage, Traffic Signage.
Division 26 - Electrical, Exterior Lighting, Lighting Poles and Standards, Roadway Lighting.
Division 31 - Earthwork, Embankments, Erosion and Sedimentation Controls, Slope Protection, Gabions, Riprap, Special Foundations and Load-Bearing Elements, Driven Piles.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Rigid Paving, Fences and Gates, Retaining Walls.
Division 34 - Transportation, Bridges.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents