Last Updated | 08/22/2022 03:02 PM |
Project Title | FAI 290 (Eisenhower Expressway) at Leavitt Street and Ashland Avenue Structures, Phase II Project |
Physical Address | View project details and contacts |
City, State (County) | Chicago, IL 60624 (Cook County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Bridge, Paving/Reconstruction, Site Development |
Contracting Method | Competitive Bids |
Project Status | Obtained from a credible source, Awaiting verification, Construction start expected December 2022 |
Bids Due | View project details and contacts |
Estimated Value | $21,140,000 [brand] Estimate |
Plans Available from | State Agency |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | As of August 22, 2022, an engineer has been selected. The stage of design has not been determined. A firm timeline for construction has not been determined. *The closed solicitation has been included below for reference: The Complexity Factor for this project is 0.035. The Consultant who is selected for this project and all Subconsultant the Prime Consultant will be using are scheduled to attend an initial meeting on October 25, 2021 at 10:00 AM at the Region One/ District One Office in Schaumburg. Phase II engineering services are required for the improvements of Leavitt Street and Ashland Avenue bridge structures over I-290 (Eisenhower Expressway). The Consultant's work is expected to consist of preparing contract plans, specifications, and estimates for the bridge superstructure replacement of the existing Leavitt Street and Ashland Avenue Bridges over the Eisenhower Expressway (I-290). The Consultant's work may include topographic survey, drainage design, bridge and approach roadway design, underpass lighting, traffic signal modernization and interconnect as well as other structural tasks as determined by the department. The proposed improvement will consist of replacement of the existing bridge superstructures, parapets, and approach slabs under a full detour for Leavitt Street and staged construction for Ashland Avenue in addition to substructure repairs and all other incidental work required to complete Phase II contract plans. The completion date for this contract will be 18 months after authorization to proceed. The Prime firm must be prequalified in the following categories to be considered for this project: Highways (Roads and Streets) Structures (Highway: Typical) Statements of Interest, including resumes of the key people noted above, must be submitted electronically to the Central Bureau of Design and Environment through the Engineering Prequalification and Agreement System (EPAS). Questions concerning this Bulletin should be directed to: E-mail: DOT.ConsultantServices@illinois.gov Or mailing address: Bureau of Design and Environment 2300 South Dirksen Parkway Attn: Consultant Unit Room 330 Springfield, IL 62764 The method of contractor selection has not been determined at this time. IDOT - RFQ Engineering - FAI 290 (Eisenhower Expressway) at Leavitt Street and Ashland Avenue Structures, Phase II Project *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed. |
||||||||||||||||||||
Details |
|
||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |