Similar Projects
Animas Aurto Transformer
Alteration
Bidding
Farmington, NM

Emergency Generator and Fire Pump
Post-Bid
Shiprock, NM

Bluffview-Labor Preparation Manual Transfer Switch
Post-Bid
Farmington, NM

BIE/NMNN/FACMGT/3-Generators
Results
Fruitland, NM 87416

Wind Turbine Training System
Results
Farmington, NM 87402

Hanger Fans
Term Contract
Post-Bid

Generator Preventive Maintenance and Repair
Term Contract
Results

Lumark Navion LED Light
Alteration
Post-Bid
Aztec, NM

Animas Substation Circuit Breakers
Results
$636,168 est. value
Farmington, NM 87401

Generator Project
Alteration
Post-Bid
Aztec, NM

Bluffview Substation Switchyard Equipment
Results
$46,626 est. value
Farmington, NM

Construction of Mesa Elementary School Parking Lot Lighting
Results
Shiprock, NM 87420

Bluffview Substation Distribution Relay Panels
Results
Less than $140,620 est. value
Farmington, NM 87401

3 Phase Padmount Transformers
Results
Farmington, NM 87401

Electronic 3 Phase Reclosers
Term Contract
Results
Farmington, NM 87401

Last Updated 12/16/2021 09:54 AM
Project Title

Animas Control Building Electrical

Physical Address View project details and contacts
City, State (County) Farmington, NM   (San Juan County)
Category(s) Single Trades
Sub-Category(s) Electric
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value Less than $240,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Bids for the electrical installation of light industrial electrical equipment within the newly constructed Animas Substation Control Building per the National Electrical Code (NEC).

Details

Division 26 - Electrical.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents