Similar Projects
Site, Signage and Lighting Improvements at Independence Mall Garage
Bidding
Philadelphia, PA 19106

Culinary Arts Suite Renovation at General Louis Wagner Middle School - Electrical
Bidding
$182,609 est. value
Philadelphia, PA 19126

Photovoltaic Renewable Energy System Potential at Northeast Philadelphia Airport (PNE)
Post-Bid
Philadelphia, PA 19114

Terminal B/C Vestibules - Electrical
Post-Bid
$500,000 to $1,000,000 est. value
Philadelphia, PA 19102

Cable NF 367984 DCM to IVU W01 20FT
Results
Philadelphia, PA 19107

Power Supply General Railway 56604-208-2
Results
Less than $25,000 est. value
Philadelphia, PA

Major Addition & Renovation At Rhawnhurst Elementary School-Electrical
Bidding
Less than $3,362,301 est. value
Philadelphia, PA 19152

Request for Quotation - Eaton UPS
Post-Bid
Philadelphia, PA 19112

Capital Region Job Order Contracting Services
Term Contract
Results

Concourse D & E Pc Air Replacements - Electrical
Bidding
$300,000 to $500,000 est. value
Philadelphia, PA

Pavement and Grounds Facilities - Electrical
Post-Bid
Philadelphia, PA

Northeastern Region Job Order Contracting Services - Electrical
Term Contract
Results

Switch Rectifier Rn-2D
Post-Bid
Less than $25,000 est. value
Philadelphia, PA

Susquehanna Dauphin Station Improvements - Electrical Construction
Results
Philadelphia, PA 19132

General, Electrical, Plumbing, Building & Yard Emergency Services
Term Contract
Post-Bid

Reported 03/03/2021 12:00 AM
Project Title

Electrical Work For Passenger Elevator Modernizations (Units #13 And #14)

Physical Address View project details and contacts
City, State (County) Philadelphia, PA   (Philadelphia County)
Category(s) Single Trades
Sub-Category(s) Electric
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description

1. Modernize two existing hydraulic elevators complete in every respect. Upgrades shall include all items required to meet the current relevant codes and ADA requirements. 2. Coordinate the work with work that is being completed by others under the direction of the PCCA. 3. Complete the work per the schedule established by the PCCA so that the work does not interfere with the site’s operations. 4. Any component or device that is listed in this specification as “Retain existing” or “Reuse existing” shall be carefully inspected by the contractor to confirm its viability and to verify that it complies with all relevant codes. Any repairs, refurbishments or replacements of retained devices and components are to be included in the contractor’s base bid. 5. If these specifications to not include details of a required feature or the installation of parts, material or equipment that is needed to provide a complete modernization that complies with all codes and standards, the contractor shall include such items in his base bid.

Details

Division 26 - Electrical.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents